A watershed protection variance may be granted by the Council of Columbus subject to the requirements of this Section. A. Criteria for Variances. Watershed protection variances shall be limited to relief from the following requirements: 1. If the applicant complies with the buffer widths and required practices, he or she can secure no reasonable return from, nor make reasonable use of, his or her property. Merely proving that the variance would permit a greater profit from the property shall not be considered adequate justification for a variance. Moreover, the local government shall consider whether the variance is the minimum possible deviation from the buffer widths that shall make reasonable use of the property possible; and 2. The hardship results from application of the buffer widths to the property rather than from other factors such as unrelated deed restrictions; and 3. The hardship is due to the physical nature of the applicant's property, such as its size, shape, or topography; and 4. The applicant did not cause the hardship; and 5. The variance is in harmony with the general purpose and intent of the riparian buffer widths and required practices and preserves the purpose thereof; and 6. In granting the variance, the public safety and welfare have been assured, and the quality of downstream water, including but not limited to water used to supply public drinking water, has been maintained or improved; and 7. The applicant certifies that the applicant has not and does not intend to apply for a variance from the minimum buffer requirements contained in the Georgia Erosion and Sedimentation Control Act for the same perennial stream or streams for which a variance is sought pursuant to this paragraph. B. Administrative Approval. The Director of Engineering, upon finding that a watershed protection variance meets the standards for approval contained in this Section, may administratively approve such watershed protection variance within and not exceeding the following parameters: 1. The Engineering Department may allow a reduction of the 150-feet buffer requirement of the 7-mile radius area of the Lake Oliver water supply reservoir down to a 100-foot buffer along the banks of the reservoir boundaries. 2. The Director of Engineering shall grant a variance based on the criteria as set forth in Section 10.11.6.1.A.