Columbus · Zoning Ordinance
Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 10 / Article 5 - CIVIL DESIGN AND CONSTRUCTION DRAWINGS
Section 10.5.1. General Requirements.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. Requirements for Development Activity. Persons seeking to perform development activity on land in the city shall not commence or proceed until civil design and construction drawings are approved and a land development permit is issued by the Engineering Department. The drawings described in this Article must accompany an application for a development permit.
B. Civil Design and Construction Drawings. The civil design and construction drawings for a project shall conform in all respects with the requirements of this UDO, and shall include each of the plans in this Article as appropriate to the project. These plans include:
1. Erosion, sedimentation and pollution control plan;
2. Grading plan;
3. Landscaping, buffer and tree protection plans;
4. Stormwater management site plan;
5. Street improvement plan;
6. Sewage disposal plan; and
7. Domestic water supply plan.
C. Preparation of Civil Design and Construction Plans.
1. Preparation. All civil design and construction plans and supporting studies shall be prepared by or under the supervision of a qualified design professional in addition, the landscaping, tree protection and buffer plan may be prepared by or under the supervision of an arborist certified by the International Society of Arboriculture or a forester registered on a list approved by the City Arborist.
2. Certification. All plans are to be certified by a qualified design professional.
History
(Ord. No. 09-16, § 1, 4-3-09)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.