Temporary building or structure shall comply with the standards listed below. A. Accessory Use. The building or structure shall be accessory or incidental to an active residential or nonresidential construction project. B. Approval. Approval of the Director must be issued in writing prior to the installation of a temporary building. C. Compliance with Building and Health Codes. A temporary building shall comply with all applicable building and public health codes, including connection to sanitary sewer and potable water services if required. D. Duration of Approval. The temporary building shall be removed upon completion of construction, or two years, whichever is greater. The Director may extend approval for the temporary building for not more than 18 months.