Skip to content
Georgia Commons
Menu

Columbus · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 10 / Article 10 - ELECTRIC VEHICLE INFRASTRUCTURE

Section 4.10.4. Requirements for Electric Vehicle Infrastructure.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Permitted Location.

1. Level-1 and Level-2 electric vehicle charging stations are permitted in every zoning district when accessory to the primary permitted use. Such stations located at one-family, multiplefamily, and mobile home park dwellings shall be designated as private restricted use only.

Installation shall be subject to permit approval administered by the Inspections and Codes Division.

2. Level-3 electric vehicle charging stations are permitted in all districts when accessory to the primary permitted use. Installation shall be subject to permit approval administered by the Inspections and Codes Division.

3. If the primary use of the parcel is the retail electric charging of vehicles, then the use shall be considered a gasoline service station for zoning purposes. Installation shall be subject to Inspections and Codes Division approval and located in zoning districts which permit gasoline service stations.

B. Application and Approval.

1. Charging stations located at one-family, multiple-family, and mobile home park dwellings as accessory uses shall comply with the requirements of this Article and any applicable permitting requirements.

2. Charging stations located at commercial sites and as accessory uses shall comply with site review and permitting requirements. Charging stations shall not be located in subterranean spaces such as underground or below grade parking structures.

3. Charging stations located at commercial sites and as primary uses shall be subject to approval by the Inspections and Codes Division, and located in zoning districts which permit gasoline service stations. Site review and permitting requirements shall also apply.

C. General Requirements for Residential and Non-Residential Development.

1. Electric vehicle charging stations within single family residences are exempt from the below general requirements. This does not exempt electrical or other permit obligations.

2. Parking:

a. An electric vehicle charging station space may be included in the calculation for minimum required parking spaces required.

b. Public electric vehicle charging stations are reserved for parking and charging electric vehicles only. Electric vehicles may be parked in any space designated for public parking, subject to the restrictions that would apply to any other vehicle that would park in that space.

3. Accessible Spaces: It is strongly encouraged, but not required, that a minimum of one (1) accessible electric vehicle charging station be provided. Accessible electric vehicle charging stations shall not be located in close proximity to the building or facility entrance and connected to a barrier-free accessible route of travel. It is not necessary to designate the accessible electric vehicle charging station exclusively for the use of disabled persons.

4. Lighting: Site lighting shall be provided where an electric vehicle charging station is installed unless charging is for daytime purposes only.

5. Equipment Standards and Protection:

a. Battery charging station outlets and connector devices shall be no less than 36 inches and no higher than 48 inches from the surface where mounted. Equipment mounted on pedestals, lighting posts, bollards, or other devices shall be designed and located as to not impede pedestrian travel or create trip hazards on sidewalks.

b. Adequate battery charging station protection, such as concrete-filled steel bollards, shall be used. Curbing may be used in lieu of bollards, if the battery charging station is setback a minimum of 24 inches from the face of the curb.

6. Usage Fees: The property owner or operator is not restricted from collecting a service fee for the use of an electric vehicle charging station made available to visitors of the property.

7. Signage:

a. Information shall be posted identifying voltage and amperage levels and any time of use, fees, or safety information related to the electric vehicle charging station.

b. Each electric vehicle charging station space shall be posted with signage indicating the space is only for electric vehicle charging purposes. For purposes of this subsection, "charging" means that an electric vehicle is parked at an electric vehicle charging station and is connected to the battery charging station equipment.

8. Maintenance: Electric vehicle charging stations shall be maintained in all respects, including the functioning of the equipment. A phone number or other contact information shall be provided on the equipment for reporting when it is not functioning, or other problems are encountered.

9. Emergency Disconnect: For Electric Vehicle Charging Stations rated at more than 60 amps or more than 150 volts to ground, an approved remote means of disconnect must be installed in a readily accessible location and within sight of the electric charging connector. For Electric Vehicle Charging Stations designated for public use, a remote means of disconnect, approved by the fire code official, must be installed.

10. Decommissioning: Unless otherwise directed by the Columbus Consolidated Government, within 90 days of cessation of use of the electric vehicle charging station, the property owner or operator shall restore the site to its original condition. Should the property owner or operator fail to complete said removal within 90 days, the Columbus Consolidated Government shall conduct the removal and disposal of improvements at the property owner or operator's sole cost and expense.

History

The history line the source prints at the end of the section.

(Ord. No. 24-015, § 1, 3-6-24)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:columbus-muscogee/zoning/4.10.4@2026-11-11-16efe37361

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Columbus Zoning Ordinance, Section 4.10.4. Requirements for Electric Vehicle Infrastructure | Georgia Commons