Skip to content
Georgia Commons
Menu

Columbus · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 4 - GENERAL DEVELOPMENT STANDARDS / Article 5 - LANDSCAPING, SCREENING AND BUFFERING

Section 4.5.8. Required Street Buffers.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. All portions of a parcel proposed for development, redevelopment or expansion that abuts a public street or highway right-of-way shall be buffered as provided in Table 4.5.3.

B. Conflicts with Overhead Lines.

1. When the street buffer is within 20 feet of overhead utilities, small maturing trees must be substituted for the required large maturing tree.

2. Substitutions must be two for one and be planted at either 25 or 50 feet separation.

3. Substitutions must meet large maturing tree size specifications.

Table 4.5.3.

Minimum Street Buffer Standards Minimum Buffer Standard Parcel 2 Acres or Less Parcel Greater than 2 Acres Option 1 Option 2 Option 1 Option 2 Planting Strip Adjacent to a Public Right-of-Way 8 feet 5 feet 10 feet 7 feet Number of Large Trees per 100 lineal feet of Right-of-Way1 1 2 1 2 Number of Shrubs per 100 lineal feet of Right-of-Way1 25 30 25 30 Maximum Height of Berm 16 feet 16 feet 16 feet 16 feet Note.

1 Including any fraction less than 100 feet.

History

The history line the source prints at the end of the section.

(Ord. No. 09-40, § 1, 7-14-09)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:columbus-muscogee/zoning/4.5.8@2026-11-11-66b934d289

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Columbus Zoning Ordinance, Section 4.5.8. Required Street Buffers | Georgia Commons