Columbus · Zoning Ordinance
Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 6 - RESOURCE CONSERVATION / Article 4 - RESOURCE CONSERVATION SUBDIVISIONS
Section 6.4.2. Resource Conservation Subdivision Process.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
In order to achieve the open space requirement while attaining the development capacity of a subdivision site, all of the steps listed below must be accomplished.
A. Identify Conservation Areas. Conservation areas must be identified and mapped. The designations of the various areas considered Primary and Secondary Conservation Areas include references to sources of information to help determine their location.
B. Determine Conventional Development Capacity. The development capacity of the site must be determined in order to preserve current property rights. This process involves the determination of the number of lots that could be created through conventional means under the site's zoning category.
C. Establish Resource Conservation Development Capacity. To the conventional development capacity of a site are added "bonus" lots in return for the preservation of additional valuable open space beyond the minimum required.
D. Design the Subdivision. In order to balance the conservation of valuable resources with current development rights, flexibility is given in minimum lot size and other dimensional requirements.
Under no circumstances, however, may a property be developed with more lots than the site's conventional capacity plus "bonus" lots for additional conservation.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.