--- title: Columbus Zoning Ordinance, Section 7.10.3. Construction of Sidewalks collection: local-codes id: local-code:columbus-muscogee/zoning/7.10.3 cite_as: Columbus, Ga., Zoning Ordinance ยง 7.10.3 canonical_url: https://georgiacommons.org/code/local/columbus-muscogee/zoning/7.10.3 md_url: https://georgiacommons.org/code/local/columbus-muscogee/zoning/7.10.3.md text_url: https://georgiacommons.org/code/local/columbus-muscogee/zoning/7.10.3/text source_url: https://library.municode.com/ga/columbus/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: consolidated:columbus-muscogee jurisdiction_name: Columbus place_fips: "1319000" county_fips: "13215" corpus_version: local-codes-columbus-muscogee-8dfb039fe037 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/columbus-muscogee/zoning/~appendix-a/~chapter-7/~article-10.md previous: https://georgiacommons.org/code/local/columbus-muscogee/zoning/7.10.2.md next: https://georgiacommons.org/code/local/columbus-muscogee/zoning/7.11.1.md index: https://georgiacommons.org/code/local/columbus-muscogee.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:columbus-muscogee/zoning/7.10.3@2026-11-11-a87d75a119 --- # Columbus Zoning Ordinance, Section 7.10.3. Construction of Sidewalks > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 7 - PROJECT DESIGN STANDARDS / Article 10 - SIDEWALKS Sidewalks shall comply with the construction requirements listed below. A. Width and Thickness. Concrete sidewalks shall be a minimum of 5 feet wide and 5 inches thick. B. Minimum Strength. Concrete shall be at least 3,000 p.s.i. at 28 days' strength. C. Completion. Upon completion, sidewalks shall be backfilled and grassed. D. Timing of Installation. Sidewalks shall be shown on construction drawings for the streets, and shall be accommodated in grading plans and activities for right-of-way preparation, but may be installed on a lot-by-lot basis after the final plat for the subdivision or phase is recorded. Within a final-platted subdivision, the required sidewalk along each lot frontage shall be installed no later than when the driveway is installed, provided that all sidewalks throughout the finalplatted subdivision shall be installed prior to the end of the maintenance period. Sidewalk installation shall provide continuity to adjoining sidewalks as to grades, appearance and construction standards.