--- title: Columbus Zoning Ordinance, Section 7.12.11. Minimum Clearances collection: local-codes id: local-code:columbus-muscogee/zoning/7.12.11 cite_as: Columbus, Ga., Zoning Ordinance ยง 7.12.11 canonical_url: https://georgiacommons.org/code/local/columbus-muscogee/zoning/7.12.11 md_url: https://georgiacommons.org/code/local/columbus-muscogee/zoning/7.12.11.md text_url: https://georgiacommons.org/code/local/columbus-muscogee/zoning/7.12.11/text source_url: https://library.municode.com/ga/columbus/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: consolidated:columbus-muscogee jurisdiction_name: Columbus place_fips: "1319000" county_fips: "13215" corpus_version: local-codes-columbus-muscogee-8dfb039fe037 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/columbus-muscogee/zoning/~appendix-a/~chapter-7/~article-12.md previous: https://georgiacommons.org/code/local/columbus-muscogee/zoning/7.12.10.md next: https://georgiacommons.org/code/local/columbus-muscogee/zoning/7.12.12.md index: https://georgiacommons.org/code/local/columbus-muscogee.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:columbus-muscogee/zoning/7.12.11@2026-11-11-c4bf05b2cb --- # Columbus Zoning Ordinance, Section 7.12.11. Minimum Clearances > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 7 - PROJECT DESIGN STANDARDS / Article 12 - STORM DRAINAGE A. Culverts. At least two feet between the bottom of the base or sub-base, if used, and the exterior crown of the culvert (top of pipe) is required under the roadway. B. Pipes in Easements. Pipes included in easements shall have a minimum cover of one foot or at the manufacturers' recommendations. C. Underground Utilities. A minimum of six inches of cover shall be provided between underground utilities and exterior crown of culverts. D. Trench Construction. Trench construction for storm drainage pipe shall be in accordance with DOT.