Skip to content
Georgia Commons
Menu

Columbus · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 7 - PROJECT DESIGN STANDARDS / Article 13 - PUBLIC WATER SYSTEM

Section 7.13.1. Connection Required.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Any single-family or multifamily dwelling, commercial or industrial establishment shall be connected to a public water supply. Water mains and connection to the water supply shall be at the cost of the property owner. The installation of said mains and connection to each lot shall be installed prior to the paving of the street.

History

The history line the source prints at the end of the section.

(Ord. No. 11-55, § 1, 11-8-11)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:columbus-muscogee/zoning/7.13.1@2026-11-11-a0e9bc0fb2

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Columbus Zoning Ordinance, Section 7.13.1. Connection Required | Georgia Commons