--- title: Columbus Zoning Ordinance, Section 7.9.4. Commercial/Industrial Subdivision Entrances collection: local-codes id: local-code:columbus-muscogee/zoning/7.9.4 cite_as: Columbus, Ga., Zoning Ordinance ยง 7.9.4 canonical_url: https://georgiacommons.org/code/local/columbus-muscogee/zoning/7.9.4 md_url: https://georgiacommons.org/code/local/columbus-muscogee/zoning/7.9.4.md text_url: https://georgiacommons.org/code/local/columbus-muscogee/zoning/7.9.4/text source_url: https://library.municode.com/ga/columbus/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: consolidated:columbus-muscogee jurisdiction_name: Columbus place_fips: "1319000" county_fips: "13215" corpus_version: local-codes-columbus-muscogee-8dfb039fe037 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/columbus-muscogee/zoning/~appendix-a/~chapter-7/~article-9.md previous: https://georgiacommons.org/code/local/columbus-muscogee/zoning/7.9.3.md next: https://georgiacommons.org/code/local/columbus-muscogee/zoning/7.9.5.md index: https://georgiacommons.org/code/local/columbus-muscogee.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:columbus-muscogee/zoning/7.9.4@2026-11-11-2286723a30 --- # Columbus Zoning Ordinance, Section 7.9.4. Commercial/Industrial Subdivision Entrances > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 7 - PROJECT DESIGN STANDARDS / Article 9 - DRIVEWAY AND DEVELOPMENT ENTRANCES A. Deceleration Lanes Required. A deceleration lanes shall be installed at all entrance roads into a commercial or industrial subdivision. B. Traffic Impact Study. 1. Study May be Required. The Director of Engineering may require a traffic study to determine if the project's size warrants a center turn lane, longer deceleration lane, an acceleration lane or other improvements. 2. Required Improvements. If the traffic study determines that further steps or improvements should be taken to protect the traveling public, the Director of Engineering will impose the additional requirements.