A. Deceleration Lanes Required. Service stations and other nonresidential uses, apartment/condo and mobile home complexes shall install deceleration lanes. B. Interior Subdivision Street Access. Service stations and other commercial businesses on corner lots that have frontage on interior subdivision streets shall have access only from the main street. C. Corner Lots. Commercial businesses on corner lots that have frontage on a local or minor collector side street shall install an additional lane out to the intersection if driveway access from said side street is provided. D. Traffic Impact Study. 1. Study May be Required. The Director of Engineering may require a traffic study to determine if a center turn lane, a longer deceleration lane, an acceleration lane or other improvements will be necessary. 2. Improvements Required. If the traffic study determines that the traffic generated by the project and the existing City street warrants it, the Director of Engineering will require the additional improvements or other mitigating measures.