--- title: Columbus Zoning Ordinance, Section 7.9.7. Widening for Development Entrances collection: local-codes id: local-code:columbus-muscogee/zoning/7.9.7 cite_as: Columbus, Ga., Zoning Ordinance ยง 7.9.7 canonical_url: https://georgiacommons.org/code/local/columbus-muscogee/zoning/7.9.7 md_url: https://georgiacommons.org/code/local/columbus-muscogee/zoning/7.9.7.md text_url: https://georgiacommons.org/code/local/columbus-muscogee/zoning/7.9.7/text source_url: https://library.municode.com/ga/columbus/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: consolidated:columbus-muscogee jurisdiction_name: Columbus place_fips: "1319000" county_fips: "13215" corpus_version: local-codes-columbus-muscogee-8dfb039fe037 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/columbus-muscogee/zoning/~appendix-a/~chapter-7/~article-9.md previous: https://georgiacommons.org/code/local/columbus-muscogee/zoning/7.9.6.md next: https://georgiacommons.org/code/local/columbus-muscogee/zoning/7.10.1.md index: https://georgiacommons.org/code/local/columbus-muscogee.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:columbus-muscogee/zoning/7.9.7@2026-11-11-53f483f724 --- # Columbus Zoning Ordinance, Section 7.9.7. Widening for Development Entrances > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 7 - PROJECT DESIGN STANDARDS / Article 9 - DRIVEWAY AND DEVELOPMENT ENTRANCES A. Minimum Deceleration/Acceleration Lane Width. When required, minimum pavement width, not including curbs, and right-of-way to accommodate acceleration and deceleration lanes at development entrances are established in Table 7.9.1. Only deceleration lanes are required. Table 7.9.1 Acceleration/Deceleration Lanes Street Classification Pavement Width from Travel Lane (feet)1 ROW from Centerline (feet) Radii (feet) Arterial 14 42 40 Collector Street 14 40 40 Local Street 12 30 25 Marginal Access Street 14 32 40 1 To edge of pavement. Does not include curb and gutter. B. Measurement of Lane Length. Lane length is measured 200 feet from intersection centerline to beginning of taper. Tapers are 50 feet. Vertical face curb and gutter is required through the radii, excluding the tapers. The additional lane can be stopped at the projected property line if there is inadequate right-of-way or excessive cut or fills to install the lane. In this case, the tapers would start at the projected property line unless excessive cut or fills would encroach on the right-of-way limits of the abutting property. C. Catch Basins. The developer will pay the cost of any catch basins that must be constructed when an existing County road is required to be developed. D. Utilities and Drain Pipes. Utilities and drain pipes shall be relocated at the developer's expense outside of the acceleration/deceleration lanes. Waterlines can remain beneath the additional lanes. E. Completion of Curbing. The area behind all curbing shall be backfilled and grassed.