A. Preconstruction Activity. Following the issuance of any permit authorizing clearing and grading of a site, areas required to be undisturbed, such as natural buffers or stream greenways, must be designated by survey stakes, flags, ribbon, or other appropriate markings and shall be inspected and approved by the Department of Engineering prior to the commencement of any clearing or grading activities. B. Grading. 1. Grading Plan Required. Grading shall be done in accordance with the lines and grades drawn on the approved grading plan. 2. Erosion and Sedimentation Control. Required erosion and sedimentation control measures and stormwater drainage facilities are to be installed in accordance with the approved plans as development progresses.