The maximum slope for all cut or fill slopes shall be as provided in Table 8.3.1. The depth of cut referenced in the table shall be construed to be the maximum cut or fill occurring in any one section of cut or fill. The slope on cut or fill shall be uniform throughout for each section of cut or fill. When a cut is made in rock that requires blasting, slope may be changed to vertical slope upon the written approval of the Engineering Director. Table 8.3.1 Maximum Cut or Fill Slopes Depth of Cut on Fill Cut Slopes1 Fill Slopes 2 feet or less 2 to 1 2 to 1 2 feet to 5 feet 2 to 1 2 to 1 Over 5 feet 2 to 1 2 to 12 1Maximum distance of run to rise 2Guardrails required.