Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 8 / Article 6 - INSTALLATION OF STORMWATER DRAINAGE FACILITIES

Section 8.6.3. Off-site Drainage Facilities.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Stormwater runoff that otherwise is of unacceptable quality or which would be discharged in volumes or at rates in excess of those otherwise allowed by this Ordinance may be discharged into drainage facilities off site of the development, subject to the conditions listed below.

A. On-site Management. It is not practicable to completely manage runoff on site in a manner that meets the design and performance standards found in the Georgia Stormwater Management Manual.

B. Design, Construction and Maintenance. Off-site drainage facilities and channels leading to them are designed, constructed and maintained in accordance with the requirements of this Chapter.

C. Cost Sharing. Adequate provision is made for sharing of construction, maintenance and operating costs of the facilities. The developer may be required to pay a portion of the cost of constructing facilities as a condition to receiving approval of the stormwater management site plan.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:columbus-muscogee/zoning/8.6.3@2026-11-11-3e74ad1047

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Columbus Zoning Ordinance, Section 8.6.3. Off-site Drainage Facilities | Georgia Commons