Columbus · Zoning Ordinance
Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 8 / Article 7 - INSTALLATION OF STREETS AND UTILITIES
Section 8.7.6. Street Installation.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. Subgrade Installation. After the earth work has been completed, all storm drainage and other underground utilities have been installed under the roadbed, and the backfill in all such ditches thoroughly compacted, the subgrade shall be brought to the lines, grades and cross section shown on the plans.
B. Subgrade Materials. If any sections of the subgrade are composed of unsuitable or unstable material, such material shall be removed to the depth directed by the appropriate Engineering Department and replaced with suitable, thoroughly compacted material.
C. Preparation of Subgrade.
1. Compaction. Prior to placement of the street base, the subgrade shall be compacted to 95% density.
2. Construction Traffic. When the street is to be used for construction traffic before the paving work is completed, a layer of Number 3 stone can be laid as a traffic surface if the developer so desires.
(A) Use as Base Material. This material shall not be used as part of the base material.
(B) Use or Removal. This material may be worked into the subgrade; or it shall be removed before the base course is set up for paving.
3. Delay in Paving. Provision shall be made to drain low points in road construction when the final paving surface is delayed, subject to the criteria listed below.
(A) Berm Sections. A break in the berm section shall be provided when the curbing has not been constructed.
(B) Piping. Six-inch pipe sections shall be used to provide drainage under curb to side slopes.
(C) Abutting Property. Abutting property shall be suitably sloped to the right-of-way line.
D. Installation of Street Base, Curbing and Paving. Street base, curbing and paving shall be installed by the developer in accordance with the requirements and standards of this UDO.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.