A. No trenching/cutting should be done for new installations within the critical root zone of any tree on City right-of-way. The critical root zone is considered to be, the root system within the drip line. Any work within this area shall be coordinated with the City Arborist prior to commencement of work. When it is anticipated that the presence of trees will interfere with the planned work, the permittee shall furnish proof of coordination with the City Arborist at the time the application is submitted. The Arborist may require a plan showing the approximate location of trees located on City right-of-way. This plan should include size and species of trees and vegetation affected. A site visit by the City Arborist and a representative from the construction company/utility may be substituted in lieu of the detailed plan at the discretion of the City Arborist. B. Trees that are damaged by work on the right-of-way shall become the responsibility of the permittee and shall be immediately removed and possibly replaced in accordance with the Tree Preservation and Replacement requirements of Chapter 4. Coordination with the City Arborist is required in all cases where trees are damaged.