--- title: Columbus Zoning Ordinance, Section 8.8.9. Excavated Material collection: local-codes id: local-code:columbus-muscogee/zoning/8.8.9 cite_as: Columbus, Ga., Zoning Ordinance ยง 8.8.9 canonical_url: https://georgiacommons.org/code/local/columbus-muscogee/zoning/8.8.9 md_url: https://georgiacommons.org/code/local/columbus-muscogee/zoning/8.8.9.md text_url: https://georgiacommons.org/code/local/columbus-muscogee/zoning/8.8.9/text source_url: https://library.municode.com/ga/columbus/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: consolidated:columbus-muscogee jurisdiction_name: Columbus place_fips: "1319000" county_fips: "13215" corpus_version: local-codes-columbus-muscogee-8dfb039fe037 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/columbus-muscogee/zoning/~appendix-a/~chapter-8/~article-8.md previous: https://georgiacommons.org/code/local/columbus-muscogee/zoning/8.8.8.md next: https://georgiacommons.org/code/local/columbus-muscogee/zoning/8.8.10.md index: https://georgiacommons.org/code/local/columbus-muscogee.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:columbus-muscogee/zoning/8.8.9@2026-11-11-991b52e18b --- # Columbus Zoning Ordinance, Section 8.8.9. Excavated Material > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 8 / Article 8 - REPAIR, INSTALLATION AND CONSTRUCTION ON ALL RIGHTS-OF-WAY A. Excavated material stored on the roadway surface shall be cleaned from pavement surfaces and the surface shall be swept to the satisfaction of the field inspector. Under no circumstances shall the roadway be washed clean. The permittee shall use all available means to protect inlets from the infiltration of sediment into the drainage system including the use of approved filter barriers placed to protect the openings of inlets and pipes. B. Excavated material stored on the shoulder of the roadway shall be removed completely and damaged vegetation shall be restored immediately. The method of restoration for vegetation shall be approved by the inspector and may include seeding and mulching, sod or placement of fiber or jute blankets. C. Under no circumstances shall excess material be placed in or obstruct a drainage way including curb and gutter, or block access (ingress and egress) to someone's property. Excavated material from a job site shall be removed by the permittee by the end of each business day. D. Drawing Number E-905 or current standard is on file in the Department of Engineering and shall be the standard detail for patching specifications.