Skip to content
Georgia Commons
Menu

Columbus · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT ORDINANCE / Chapter 8 / Article 9 - BUILDING CONSTRUCTION

Section 8.9.1. Building Permit Required.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Issuance of Permits. When required, building permits shall be issued in conformance with the technical codes adopted and amended by the

City under the Georgia Uniform Codes Act.

Refer to Sec. 8-14.4 of the Columbus Code for Building Permit Requirements and Fees.

B. Relocation or Movement of Structures. A permit is required for the movement of any house, structure or building.

C. Airport Requirements and Building Permits.

Applicants for a building permit or for variances pertaining to airport requirements shall submit written approval from the Federal Aviation Administration (FAA) as required.

D. Changes to Historic Properties. Material changes in the appearance of any historic property shall not be made until approval of a certificate of appropriateness.

E. Building Permits for Areas Served by Onsite Sewage Disposal Systems. For any structure served by an on-site sewage disposal system, a

permit issued by the Muscogee County Health Department shall be required prior to issuance of a Building permit. Said permit may first require approval by the Muscogee County Health Department of a plan showing the location of the sewage disposal system and other on-site improvements, in accordance with their regulations.

F. Lots of Record. Building permits shall only be issued on lots of record, as defined in this Development Ordinance.

G. Zoning verification. Prior to issuance of a building permit, a verification shall be obtained.

The following information shall be reviewed prior to this action.

1. Single-family or two-family �Duplex� Dwellings. For a single-family detached or two-family dwelling, a plat of the lot showing the outline of the principal building and minimum building setback lines for the lot.

2. Multi-family or nonresidential Buildings. For a multi-family or nonresidential building, the site plan upon which was

granted project approval by the director of Inspections and Code.

3. Street Address. A street address number as assigned by the Geographic Information System Division (GIS).

H. Simultaneous Application and Review. An application for a building permit may proceed simultaneously with and application for project approval of a site plan, but the permit may not be issued prior to project approval of such site plan by the Engineering Department.

History

The history line the source prints at the end of the section.

(Ord. No. 09-4, § 1, 1-27-09; Ord. No. 17-20, §§ 2, 3, 5-9-17)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:columbus-muscogee/zoning/8.9.1@2026-11-11-a53b5cde28

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Columbus Zoning Ordinance, Section 8.9.1. Building Permit Required | Georgia Commons