(A) Prior to a rezoning for a sanitary landfill, the applicant shall provide to the Director a detailed site plan and a conceptual design prepared by a State registered professional engineer. The site plan shall include all of the property under consideration and shall identify proposed points of ingress and egress, the location of all surface water, the location and extent of wetlands, unusable land and buffer areas. (B) The conceptual design shall include: 1. The location and type of structures to be included on the site; 2. The location and dimensions of the landfill cells; 3. A map depicting site geology, hydrology and soils; 4. A description and schematic drawings of the proposed liner, leachate collection system and groundwater monitoring plan that will be used if the landfill is constructed; 5. The limits of any 100-year floodplain or a stream buffer of 200 feet, whichever is greater, shall be preserved as natural, undisturbed area; except for approved perpendicular access and utility crossings; 6. A 500-foot buffer conforming to specifications of this chapter shall be provided around the periphery of the tract, except for approved perpendicular access and utility crossings; 7. A fence at least six feet in height shall be provided around the periphery; 8. The City will not issue any construction or development permits for a sanitary landfill without documentation from the EPD that a permit has been issued and the proposed landfill meets all requirements of applicable State and Federal statutes and regulations.