A ground-mounted solar energy system shall be subject to the following regulations: (a) Location. Permitted Districts: GC, General Commercial District HC, Highway Commercial District LI, Light Industrial District HI, Heavy Industrial District PW, Public Works District PD, Planned Development District Prohibited Districts: R-12, Residential - Single Family, Low Density District R-7.5S, Residential - Single Family Medium Density District R-7.5, Residential - Single Family/Two Family, Medium Density District R-4, Residential - Multi-family District OI, Office & Industrial District NC, Neighborhood Commercial District CBD, Central Business District PEH, Park, Education, and Health District R-4, HC, GC, Gillespie Historic District MUD (Mixed Use District), O'Neal Historic District (b) Placement. 1. A ground-mounted solar energy system shall not be located within the front yard set-back area. In district where no front yard set-back is required, the ground-mounted solar energy system shall not be located within 30 feet of the road fronting the piece of property. 2. A ground-mounted system shall not be located over a septic system, leach field area or identified reserve area unless approved by the Health Department. 3. If located in a floodplain or an area of known localized flooding, all panels, electrical wiring, automatic transfer switches, inverters, etc. shall be located above the base flood elevation. 4. Panels and ground mounts shall be installed per manufacturer's specifications. 5. All ground-mounted solar energy systems shall be placed so that concentrated solar radiation or glare does not project onto nearby structures or roadways. (c) Maximum Area Coverage. A solar energy system shall not exceed 50% of the footprint of the principal building served. For residential properties located in agricultural districts, a ground-mounted solar energy system shall not exceed 25% of the footprint of the principal building served. (d) Height. The maximum height of a ground-mounted solar energy system shall not exceed the maximum building height for accessory buildings in the zoning district in which it is located. (e) Permitting. A building permit is required for any ground-mounted solar energy system and for the installation of any thermal solar energy system. (f) Additional Submission Requirements. In addition to requirements for information to be provided during the site plan review and development permitting process, the facility shall not be approved for operation until the following are submitted: 1. Copy of all lease agreements and solar access easements. 2. Where interconnection to an electric utility grid is proposed, the applicant shall submit evidence that the electrical utility provider has been informed of the customer's intent to install a connection with the local electric utility grid. A copy of the approval from the local utility must also be provided before operation of an interconnected facility will be authorized. 3. A decommissioning plan for the anticipated service life of the facility or in the event that the facility is abandoned or has reached its life expectancy. 4. The City may require other studies, reports, certifications, and/or approvals be submitted by the applicant to ensure compliance with this section.