--- title: Cordele Zoning Ordinance, Section 4.9. Subgrade preparation collection: local-codes id: local-code:cordele/zoning/4.9 cite_as: Cordele, Ga., Zoning Ordinance ยง 4.9 canonical_url: https://georgiacommons.org/code/local/cordele/zoning/4.9 md_url: https://georgiacommons.org/code/local/cordele/zoning/4.9.md text_url: https://georgiacommons.org/code/local/cordele/zoning/4.9/text source_url: https://library.municode.com/ga/cordele/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:cordele jurisdiction_name: Cordele place_fips: "1319616" corpus_version: local-codes-cordele-60ee2e0ac223 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/cordele/zoning/~appendix-a/~article-n.md previous: https://georgiacommons.org/code/local/cordele/zoning/4.8.md next: https://georgiacommons.org/code/local/cordele/zoning/4.10.md index: https://georgiacommons.org/code/local/cordele.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:cordele/zoning/4.9@2026-11-11-29db55b6fe --- # Cordele Zoning Ordinance, Section 4.9. Subgrade preparation > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - ZONING / Article N - STREET IMPROVEMENT STANDARDS (a) Clear and grub entire street right-of-way before commencing street earthwork construction. For specific technical requirements reference is made to Georgia DOT Specifications Section 201-Clearing and Grubbing Right-of-Way. Combustible material generated from clearing and grubbing operations may be burned when authorized by the Fire Chief. (b) Conduct street earthwork construction in accordance with Georgia DOT Specification Sections 205 - Roadway Excavation and 208 - Embankments. For purposes of these Regulations, the maximum density of soil material shall be determined by ASTM D 698 (Standard Proctor) test procedures. (c) Complete utility and drainage earthwork before starting street subgrade construction. (d) Perform subgrade construction in accordance with Georgia DOT Specification section 209 - Subgrade Construction. (e) The developer shall provide quality control testing during earthwork and subgrade construction as necessary to assure the entire earthwork, including all fill layers and subgrades, meet the minimum requirements of these Regulations. The minimum quality control testing to be provided consists of the following: (1) Moisture-density relationship curve for each type soil encountered. (2) One in-place density test (ASTM D 1556 or other recognized method) per 1200 square yards of street subgrade. If development containing less than 1200 square yards of subgrade, provide at least one in-place density test. (3) One in-place density test (ASTM) D1556 or other recognized method) per 1000 cubic yards or fraction thereof of fill placed. (f) Earthwork which falls below specified minimum quality control limits shall be removed, reconstructed and retested until compliance with specified requirements is achieved. (g) After completing street earthwork operations and before beginning street base construction, the developer shall file a copy of the quality control test results demonstrating compliance with these requirements with the Cordele Department of Community Development. At any time during the construction process, representatives of the City may request to review and the developer shall provide quality control test results.