Permanent easements for public water, sanitary sewer and natural gas facilities shall be dedicated to the City. The minimum width permanent easements for a single utility shall be 20 feet. Where more than one utility has a common easement, the minimum easement width shall be increased by 10 feet for each additional utility. Before dedication, the developer shall grass and stabilize all disturbed areas within and adjacent to easements which are not covered by paving or other improvements. An acceptable stand of grass free of eroded or bare areas as defined in paragraph 4.lO(e) of these Regulations must be achieved before the City will consider dedication.