--- title: Cordele Zoning Ordinance, Section 5.6. Sanitary sewer design criteria collection: local-codes id: local-code:cordele/zoning/5.6 cite_as: Cordele, Ga., Zoning Ordinance § 5.6 canonical_url: https://georgiacommons.org/code/local/cordele/zoning/5.6 md_url: https://georgiacommons.org/code/local/cordele/zoning/5.6.md text_url: https://georgiacommons.org/code/local/cordele/zoning/5.6/text source_url: https://library.municode.com/ga/cordele/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:cordele jurisdiction_name: Cordele place_fips: "1319616" corpus_version: local-codes-cordele-4c88194cb7c3 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/cordele/zoning/~appendix-c.md previous: https://georgiacommons.org/code/local/cordele/zoning/5.5.md next: https://georgiacommons.org/code/local/cordele/zoning/5.7.md index: https://georgiacommons.org/code/local/cordele.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:cordele/zoning/5.6@2026-11-11-658c7fe2e6 --- # Cordele Zoning Ordinance, Section 5.6. Sanitary sewer design criteria > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - DEVELOPMENT REGULATIONS PEAK WATER DEMANDS FOR RESIDENTIAL DEVELOPMENTS (a) Design Capacity: Design sewer systems for the estimated ultimate development tributary population and/or area. In establishing design capacity, the following factors must be considered. (1) Maximum hourly residential sewage flow. (2) Maximum hourly commercial/institutional sewage flow. (3) Maximum hourly industrial sewage flow. (4) Ground water infiltration. (5) Topography of the area. (6) Pumping requirements. Design new sewers in residential areas on the basis of an average daily flow of sewage of not less than 400 gallons per household per day. A peaking factor of not less than 3.0 must be applied to the average daily flow to establish peak design flow. Sewers shall be designed to carry peak design flow when flowing one-half full. In non-residential developments, base sewer design on the estimated peak flow from the development but in no case less than 0.4 gallon per square foot of gross building areas. Sewers shall be designed to carry peak flow when flowing one-half full. (b) Size and Shape: The minimum size sanitary sewer shall be 8 inches. Design sewers to give mean velocities, when flowing half full, of not less than 2.0 feet per second based on the Manning formula using an "n" value of0.013. Table 5.3 gives the minimum slopes which must be provided, however, where possible greater slopes are desirable. Place sewers with a uniform slope between manholes. Nominal Sewer Size In Inches 8 10 TABLE 5.3 MINIMUM SEWER SLOPES 1817 Minimum Slope In Feet Per 100 Feet § 5.6 Nominal Sewer Size In Inches 12 15 18 21 24 27 30 36 (c) Manholes: Install manholes at the following locations: (1) End of each sewer. (2) At all changes in grade, size, or alignment. (3) At all sewer intersections. Minimum Slope In Feet Per 100 Feet 0.22 0.15 0.12 0.10 0.08 0.067 0.058 0.046 ( 4) At distances not greater than 400 feet for sewer 15 inches. When changing pipe sizes at a manhole, align the 0.8 depth point of both sewers at the same elevation. When the same size pipe enters and leaves a manhole, provide at least a 0.1 foot drop in elevation between the entering and the exiting inverts. Construct a U shaped flow channel through manholes. (d) Relation to Water Mains: Whenever possible, lay sewers at least 10 feet horizontally from any existing or proposed water main. Should conditions prevent a separation of 10 feet, lay the lines in separate trenches. In either case, construct the elevation of the crown of the sewer at least 18 inches below the bottom of the water main. When sewers cross under water mains, lay the sewer so that the top of the sewer is at least 18 inches below the bottom of the water main. Install the two pipes such that a full length of pipe will be centered over the crossing so that all joints will be separated as much as possible. Install ductile iron pipe for both lines when the crossing is less than two feet of separation. (e) When sewers are laid in public streets, construct the sewer along the centerline of the street at a depth of not less than 5 feet from the road surface to the top of the pipe. In curved streets, install the sewer between gutter lines to avoid conflicts with other utilities. (f) State Approval: It is the developer's responsibility to obtain the approval of the Environmental Protection Division of the Georgia Department of Natural Resources for sanitary sewer collection system additions and extensions. In addition to other requirements, the City must receive a copy of the approval before the developer will be allowed to proceed with construction.