Site grading shall be done in accordance with the finished grades shown on the approved development drawings. Site grades shall direct surface drainage away from buildings without causing adverse impact on adjacent properties. The maximum slopes for soil cut or fill shall be two feet of horizontal run for each foot of vertical rise or fall. If actual soils encountered require a flatter slope for stability, the lesser slope shall be used. Soil erosion and sediment control measures shall be provided as required in the Soil Erosion and Sediment Control Ordinance.