Except as provided in Section 430.4 (Final Plat Approval), every subdivider shall be required to have installed the street improvements and utilities required by this Article prior to the approval of the Final Plat. 700.1 Standards. All required street improvements, utilities and monuments shall be built to standards specified by the agency responsible for each. All utilities to be installed in the streets and/or alleys shall be placed, the pipe properly bedded and the soil compacted to City standards prior to paving completion.