Skip to content
Georgia Commons
Menu

Cordele · Zoning Ordinance

Appendix A - ZONING / Article VII - REQUIRED IMPROVEMENTS

Section 740. Utilities.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

7 40.1 Location. All utility facilities, including but not limited to gas, electric power, telephone, and cable television, shall be located underground throughout the subdivision.

Wherever existing utility facilities are located above ground, except where existing on public roads and rights-of-way, they shall be removed and placed underground. All utilities existing and proposed throughout the subdivision shall be shown on the Preliminary Plat. Underground service connections to the street property line of each platted lot shall be installed at the owner's expense. At the discretion of the Planning Commission, the requirement for service connections to each lot may be waived in the case of adjoining lots to be retained in single ownership and intended to be developed for the same primary use.

7 40.2 Easements.

(a) Easements centered on rear lot lines shall be provided for utilities (private public).

Such easements shall be at least ten (10) feet wide, or as required by Section 5.2 of the City of Cordele's Development Regulations. Proper coordination shall be established between the owner and the applicable utility companies for the placement of utility easements on adjoining properties.

(b) Where topographical or other conditions are such as to make impractical the inclusion of utilities within the rear lot lines, perpetual unobstructed easements at least 10 feet in width shall be provided along side lot lines with satisfactory access to the road or rear lot lines. Easements shall be indicated on all plats.

740.3 Sanitary sewers. Sanitary sewer lines and manholes shall be provided in accordance with the City's Development Regulations.

740.4 Water distribution system. Water mains within the subdivision with fire hydrant and with connections to each lot shall be provided. Minimum diameter of water pipes shall normally be six inches.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:cordele/zoning/appendix-a-article-vii-740@2026-11-11-9c1d82bb7d

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Cordele Zoning Ordinance, Section 740 (Appendix A, Article VII). Utilities | Georgia Commons