Number of Dwelling Units 5 10 20 30 40 50 60 70 80 90 100 150 200 300 400 500 750 1000 PEH R-12 R-7.5a R-7.5 R-4 PUD or NC HC CBD GC II EI GPM per Dwelling Unit 8.0 5.0 4.3 3.8 3.4 3.0 2.7 2.5 2.2 2.1 2.0 1.6 1.3 1.2 0.9 0.8 0.7 0.6 TABLE 5.2 MINIMUM DESIGN FIRE FLOWS (1) Zoning District Park Education and Health One Family Residential One Family Residential One and Two Family Residential Multiple Unit Residential Planned Unit Development Office Institutional Neighborhood Commercial Highway Commercial Central Business District General Commercial Intensive Industrial Extensive Industry GPM 1250 500 750 750 1000 (2) 750 1000 1000 3000 1000 1250 1250 ยง 5.4 (1) Values given in this table represent minimum requirements. Should Fire Chief or Insurances Services Office, Inc. recommend higher fire flows, use the largest values. (2) Use flows for various components of PUD. (d) State Approval: It is the developer's responsibility to obtain the approval of the Environmental Protection Division of the Georgia Department of Natural Resources of all water distribution system additions and extensions. In addition to the other requirements, the City must receive a copy of the approval before the developer will be allowed to proceed with construction.