A publicly connected or community sanitary sewer system shall be installed when the cost of installing such a system does not exceed one hundred fifty percent (150%) of the cost of installing septic tanks for all lots in the subdivision. Where lots cannot be economically connected with a sanitary sewer system, they must contain adequate area for the installation of approved septic tank and disposal fields approved by the County Health Department. All sewer facilities shall be installed in accordance with the standards of the Environmental Protection Division of the state of Georgia Department of Natural Resources.