The subdivider shall incur the cost of construction and installation of all required public improvements based on the following: a) Streets. Incur the cost for the construction of streets up to twenty-seven feet (27’) in pavement width from back of curb to back of curb, or twenty feet (20’) in pavement width from edge of pavement to edge of pavement if no curbs and gutters are installed. b) Water and Sewer Systems. Incur the cost for the installation of all water and sewer system which are required to serve the new subdivision and tie in with existing water and sewer systems, based on the specifications set forth herein. c) Sidewalks. Entire cost if provided. d) Monuments. Entire cost. e) Street Signs. Entire cost. f) Entire cost of painting centerlines and sidelines on all streets and roads.