Crawford County · Zoning Ordinance
Article VIII - SPECIAL PROVISIONS FOR SPECIFIC USES / 8.14 - SOLAR ENGERY SYSTEMS (Hereinafter, “SES”)
8.14.4. General Requirements for All Ground Mounted Solar Energy Systems
About this text
- As posted on the county's website, retrieved 2026-11-23
The following requirements apply to all Ground Mounted SESs, in addition to the specific requirements in this ordinance that apply to Intermediate and Large-Scale SESs respectively.
(a) Solar Access. Consistent with O.C.G.A. § 44-9-20 et seq., a property owner may obtain a solar easement from another property owner for the purpose of ensuring a Ground Mounted SES adequate exposure to sunlight.
(b) Impervious Surface. Ground mounted structures and components of the Ground Mounted SES, including transformers and foundations, shall be considered impervious.
However, for purposes of compliance with any Crawford County zoning code’s impervious surface coverage requirements, the panels of a Ground Mounted SES shall be considered pervious if they maintain sheet flow and allow for water to infiltrate under and around them through a pervious surface and into the subsoil.
(c) Lighting. To reduce light pollution, lighting of a Ground Mounted SES shall: 1) be limited to the minimum reasonably necessary for its safe operation; 2) be directed downward where reasonably feasible; 3) incorporate full cut-off fixtures; and 4) reasonably utilize motion sensors.
(d) Tree Removal. The removal of trees or natural vegetation for a Ground Mounted SES shall be avoided to the extent reasonably practicable and shall comply with the requirements of the Crawford County zoning code.
(e) Decommissioning.
(1) An application for a solar farm permit shall be accompanied by a decommissioning and restoration plan prepared by a professional engineer duly licensed by the State of Georgia. The decommissioning plan shall include, at a minimum:
a) A description of the anticipated life of the solar farm project.
b) The parties responsible for the decommissioning and restoration.
c) Defined conditions upon which decommissioning will be initiated (e.g., end of lease, condition of a potential public safety hazard, etc.);
d) The estimated decommissioning and restoration costs and timeframe for completion of activities.
e) The amount by which such costs were reduced due to the recyclable value of any materials.
f) The method for ensuring that funds will be available for decommissioning and restoration of the real property.
g) Removal of all non-utility owned equipment, conduits, structures, fencing, roads, and foundations (and/or a written, notarized waiver signed by the property owner and filed with the clerk of court releasing the solar farm developer from this requirement or a portion thereof).
h) Restoration of the property to a condition prior to development of the solar project (and/or a written, notarized waiver signed by the property owner and filed with the clerk of court releasing the solar farm developer from this requirement or a portion thereof); and
i) A signed statement from the party responsible for completing the decommissioning activities acknowledging such responsibility.
(2) To the extent allowed by law, an application for a solar farm permit shall be accompanied by a bond ensuring that funds will be available for decommissioning the solar farm and reasonably restoring the site to its natural condition. The bond shall be in the form of cash or surety from a bonding company qualified to transact business in the State of Georgia and acceptable to the Crawford County Commissioner's Office. The bond shall be payable to Crawford County in an amount determined by the Commissioner's Office to be reasonably sufficient to cover removal of the solar farm in its entirety and reasonable restoration of the site to its natural condition. The bond shall be maintained as long as the solar farm exists, regardless of whether it is actively operating. If the bond is not maintained as provided herein, Crawford County may call the bond and use the proceeds to remove the solar farm in its entirety and to reasonably restore the site to its natural condition. The bond may be released or returned when the county's code enforcement office determines in its reasonable discretion that the decommissioning of the solar farm has been completed in accordance with all applicable ordinances and federal and state laws.
(3) Any solar farm that has not been in use for a period of 180 consecutive days for its original purpose as approved by the county code enforcement office shall be deemed abandoned and shall not be authorized to recommence operations until a new application and inspection have been completed.
(4) No later than 90 days after abandonment or closure, the owners and operators of a solar farm shall remove the solar energy system, its equipment and parcels, and any appurtenant structures.
No later than 120 days after abandonment or closure, the owners, or operators of any such solar farm shall provide written documentation acceptable to the county's code enforcement office demonstrating that the solar panels and related equipment were properly disposed of in accordance with federal, state, and local laws and regulations.
(5) The county code enforcement office may, in its reasonable discretion, recommend waiving any of the above-listed conditions which are not reasonable in light of the nature of the project and may add additional conditions or safeguards as needed for public health, safety, and welfare or to mitigate the impact of the solar farm on surrounding properties and uses. Violations of any such additional conditions or safeguards shall be a violation of this Section.
Read this code where it is posted (county website (crawfordcountyga.org)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.