Sec. 109-158. Required submissions for final plat.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
In the case of a subdivision, upon completion of required improvements, the subdivider may then submit an application for final plat approval, which at minimum shall meet the requirements for final plat applications as specified in Table 1.
In addition, the applicant for final plat shall submit to the administrative officer the following:
(1) One time-stable reproducible film copy or original of the plat;
(2) A letter from the city engineer certifying that all required improvements have been constructed and meet the specifications of the city. The subdivider shall, upon completion of the required improvements outlined in this article, request in writing that the city engineer report by letter that
all improvements required by this article have been completed according to city specifications. The city engineer shall write a letter of compliance addressed to the subdivider with a copy to the administrative officer stating the subdivision complies with the provisions of this article.
Prior to writing such letter, the city engineer shall inspect all underground installations, sub-grades, bases or courses of asphalt, and such improvements shall not
be covered or hidden before they are inspected and accepted by the city engineer;
(3) A letter from the applicable electricity service company may be required indicating that service points for individual lots and streetlights, if required, have been
installed;
(4) A performance bond for those required improvements not yet completed (e.g., pavement topping), if such delay in completion of required improvements is permitted by
the administrative officer. The performance bond shall be:
a. Conditioned upon the faithful performance by the subdivider or developer of all work required within a specified time;
b. Payable to, and for the indemnification of, the city;
c. In an amount equal to the cost of construction of the required improvements not yet completed, plus an additional ten percent of said costs,
as calculated by the city engineer;
d. With surety by a company entered and licensed to do business in the state; and
e. Approved as to form and content by the city attorney.
(5) A maintenance bond, cash deposit, escrow account or other guarantee/instrument of financial security as approved by the city attorney to ensure maintenance of required improvements in the subdivision for a period of one year, payable to the city
and in the amount of ten percent of the city engineer's estimate of actual construction cost. If, upon being notified of failure of required improvements, the subdivider
does not correct the deficiency or commence work within ten days of notice, it shall be deemed to be a failure on the
bond, and the city shall have the right to make the necessary repairs, either by public work or by private contract, and the bond or instrument of financial security shall be liable for the full amount of the cost of said repairs, as determined by
the city engineer.
(6) As-built drawings acceptable to the city engineer of:
a. All streets showing the planned and actual location of all utility lines;
b. Centerline profile of all streets with final grades; and
c. Horizontal and vertical alignment, including profiles and invert elevations of all storm and sanitary sewer lines;
provided, however, the administrative officer may waive this final plat submittal requirement for a set period of time if
improvements and/or as-built drawings are not complete, subject to subsequent denial of building permits should such drawings not be submitted.
History
(Ord. of 2-18-2003, § 410)