The base and sub-base shall be installed in compliance with specifications of the city engineer. (1) Residential streets shall consist of type 1 paving, mix 200 pounds square yard crusher run into top six inches of subbase, if required; place and compact six inches crusher run base; place two inches plant mix binder, place one inch plant mix topping, type F. The final top coat to be applied after development is approximately 95 percent complete. (2) For commercial and industrial street paving base, use eight inches graded aggregate base (GAB), prime and place two inches of plant mix type E and surface with one inch of compact hot plant mix topping, type F. For commercial and industrial street paving base, use six inches crusher run base, prime and place two inches of plant mix asphaltic binder and surface with one inch of compact hot plant mix topping, type E.