The gas system and any other underground utilities system when it is to be installed in a subdivision or land development shall be installed along with service connections before any paving is laid. All utility facilities, including but not limited to gas, electric power, telephone, and cable television, shall be located underground throughout the subdivision or land development. Whenever existing utility facilities are located above ground, except when existing on public roads and rights-of-way, they shall be removed and placed underground.