Pursuant to section IV of General Permit (No. GAR100000), Authorization to Discharge Under the National Pollutant Discharge Elimination System (NPDES) Stormwater Discharges Associated with Construction Activity, (June 12, 2000), those persons conducting a construction activity of five acres (disturbed area) on sites greater than five acres or part of a common development greater than five acres shall prepare and implement an erosion, sedimentation and pollution control plan (plan) and a comprehensive monitoring program (program). The plan shall describe those best management practices (BMPs) which will be used at the site to control the discharge of sediment and other pollutants. BMPs will be designed to control soil erosion and sedimentation for all rainfall events up to and including a 25-year, 24-hour rainfall event. The program will describe how the receiving water will be monitored for turbidity. A monitoring summary report shall be sent to the state environmental protection division each month. Copies of these reports shall be sent to the city department of utilities. The installation of BMP devices may be subject to section 404 of the Clean Water Act. Persons conducting construction activities are also responsible for meeting water quality and wetland-related requirements of sections 404 and 401 of the Clean Water Act.