The property owner shall execute a 20-foot drainage easement surrounding the entire perimeter of the facility in favor of the city to allow the city to inspect and observe the facility as necessary. The easement boundary will be measured from the 100-year stormwater ponding limits or six inches above the elevation of the overflow. The property owner shall additionally grant permission to the city, its authorized agents and employees, to enter upon the property and to inspect the facilities whenever the city deems necessary. The city maintains the right to make emergency repairs to the facility as deemed necessary. No obstruction shall be built, constructed or planted that would inhibit proper function of the facility and its associated drainage systems.