A final inspection of nonresidential stormwater management systems will occur at the time the developer requests a certificate of occupancy inspection. At that time, any deficiencies in the facility will be noted as a punch-list item. The commercial development will not receive a certificate of occupancy until the following items are completed: (1) After construction and before acceptance for occupation or otherwise, the designer shall submit a certified field run topographic map of the detention area and a revised hydrology study using the as-built topographic map. The topographic map of the stormwater management facility should include the state plane coordinates and mean sea level elevations of applicable outfalls, silt gauges, and survey markers. The as-built will be submitted in electronic form and hard-copy form. (2) The designer shall certify that the facility is working as it was designed and that the required detention storage and outflow rates are being provided. (3) All accumulations of silt need to be removed so that the grade of the bottom of the pond is at the design grade. The silt gauge should read zero upon completion. (4) The entire stormwater management facility needs to be stabilized with permanent vegetation as shown on the approved plans.