The following table outlines application requirements for plat and plan approval: TABLE 109-68 APPLICATION REQUIREMENTS Requirement Preliminary Plat Land Development Plans Final Plat Preapplication review with staff Encouraged Encouraged Application form completed Required Required Required Letter requesting approval with name, address, and phone of applicant Required Number of copies of plat/plans 8 Copies 3 Copies 10 Copies Filing fee per section 12-109 Required Required Required Description of type of water supply and sewerage system and utilities to be provided Required Required Required Data on existing conditions Required Hydrological or other engineering study (see chapter 111, Utilities") Required Required Required APPLICATION REQUIREMENTS Requirement Preliminary Plat Land Development Plans Final Plat Warranty deed for the dedication of streets and other public places Required Written approval from electric utility company regarding installation of service points and Streetlights Required As-built drawings of public improvements and utilities Required Required Digital information (see section 109-136) Required Required Subdivision improvement guarantee Required Certificate of title Required Plat certificates Required (Ord. of 2-18-2003, table 4.1; Ord. of 5-17-2005(02), ยง 3)