shall maintain the silt fence until the project is accepted or until the fence is removed, and shall remove and dispose of silt accumulations at the silt fence when so directed by the engineer. Filter fabric shall be removed and replaced whenever it has deteriorated to such extent that it reduces the effectiveness of the silt fence. Sec. 2. Clearing and grubbing right of way.