The work shall consist of preparing and treating an existing surface with bituminous material, and blotter material, if required, in accordance with these specifications and in reasonably close conformity with the lines shown on the plans or established by the engineer. Bases and other areas to be primed shall be as follows: 1. All cement or lime stabilized bases or subbases, regardless of pavement thickness. 2. All bases, subbases or other areas, with the exception of asphaltic concrete or sand asphalt bases or subbases, on which bituminous surface treatment is to be placed. 3. All bases, subbases or other areas on which less than five inches, total thickness, of hot mix asphaltic concrete is to be placed, with the exception of asphaltic concrete bases. 11.02 Materials. Unless otherwise specified, the types of bituminous shall be selected by the contractor. The engineer will determine the grade of materials to be used. The specifications for the bituminous materials are: Latest Revision GA D.O.T. Spec. or as Amended Cut back Asphalt, RC-30, RC-70 RC-250 or MC250, MC-30 or MC-70 821.01 Emulsified Asphalt, EAP-1 822.01 Tars, RT-2, RT-3 827.01 Cutback Asphalt Emulsion, CBAE-2 823.01 Blotter Materials (Sand) 412.04.F.3