--- title: Cusseta-Chattahoochee County unified government Zoning Ordinance, 12.04. Construction collection: local-codes id: local-code:cusseta-chattahoochee/zoning/12.04 cite_as: Cusseta-Chattahoochee County unified government, Ga., Zoning Ordinance ยง 12.04 canonical_url: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/12.04 md_url: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/12.04.md text_url: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/12.04/text source_url: https://library.municode.com/ga/cusseta-chattahoochee_county date: 2026-11-11 status: active jurisdiction: consolidated:cusseta-chattahoochee jurisdiction_name: Cusseta-Chattahoochee County unified government place_fips: "1321017" county_fips: "13053" corpus_version: local-codes-cusseta-chattahoochee-687486f048f6 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/~appendix-b.md previous: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/11.04.md next: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/13.02.md index: https://georgiacommons.org/code/local/cusseta-chattahoochee.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:cusseta-chattahoochee/zoning/12.04@2026-11-11-fd3c45749f --- # Cusseta-Chattahoochee County unified government Zoning Ordinance, 12.04. Construction > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SUBDIVISION REGULATIONS A. Seasonal and weather limitation. Tack coat shall not be applied when the existing surface is wet or frozen. Emulsified asphalt shall not be placed when the air temperature is less than 40 degrees F. B. Application. The entire areas to be paved shall be coated with the tack coat. The engineer may require the application of all tack coats by use of distributor spray bars in lieu of hand hoses, except in small areas inaccessible to spray bars. C. Temperature. The temperature of the bituminous material at the time of application is specified below. The application temperature for asphalt cement should be near the upper limit of the temperature range specified. Bituminous Materials Temperature of Application (Degrees F) Asphalt Cement 325 to 375 CRS-2h 140 to 180 CRS-3 140 to 180 D. Cleaning. Just prior to the application of the tack coat, the entire area shall be cleaned until it is free from all loose dirt, clay and other objectionable materials. E. Amount. The rate of application of bituminous tack coat will be determined by the engineer. F. Limitations and area coated. No more tack coat shall be applied to the prepared road surface than can be covered with the new pavement course during normal working hours of the same working day in which the tack coat is applied. G. Maintenance and protection. After the tack coat material is applied, it shall be allowed to break until it is tacky enough to receive the surface course. Traffic shall not be allowed on the tack. Sec. 13 - Miscellaneous Concrete. 13.01 Description. This work shall consist of placing Portland cement concrete as slope paving on end rolls, cut slopes, paved ditches, spillways, and ditch slopes; in median pavement; as sidewalks; in concrete curbs, gutters, curb and valley gutters; non-reinforced headwalls; velocity dissipaters, concrete slope drains of the specified; concrete spillways and at other locations where designated on the plans or directed. It includes all subgrade preparation including fine grading and backfilling; the forming, furnishing, placing and finishing of concrete; constructing weep holes and furnishing and placing the coarse aggregate therefore; as well as furnishing and placing performed joint fillers as indicated on the plans.