This work shall consist of placing Portland cement concrete as slope paving on end rolls, cut slopes, paved ditches, spillways, and ditch slopes; in median pavement; as sidewalks; in concrete curbs, gutters, curb and gutters and valley gutters; non-reinforced headwalls; velocity dissipators, concrete slope drains of the type specified; concrete spillways and at other locations where designated on the plans or directed. It includes all subgrade preparation including fine grading and backfilling; the forming, furnishing, placing and finishing of concrete; constructing weep holes and furnishing and placing the coarse aggregate therefore; as well as furnishing and placing preformed joint fillers as indicated on the plans.