--- title: Cusseta-Chattahoochee County unified government Zoning Ordinance, 13.02. Construction collection: local-codes id: local-code:cusseta-chattahoochee/zoning/13.02 cite_as: Cusseta-Chattahoochee County unified government, Ga., Zoning Ordinance § 13.02 canonical_url: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/13.02 md_url: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/13.02.md text_url: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/13.02/text source_url: https://library.municode.com/ga/cusseta-chattahoochee_county date: 2026-11-11 status: active jurisdiction: consolidated:cusseta-chattahoochee jurisdiction_name: Cusseta-Chattahoochee County unified government place_fips: "1321017" county_fips: "13053" corpus_version: local-codes-cusseta-chattahoochee-687486f048f6 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/~appendix-b.md previous: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/12.04.md next: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/14.03.md index: https://georgiacommons.org/code/local/cusseta-chattahoochee.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:cusseta-chattahoochee/zoning/13.02@2026-11-11-79922202d3 --- # Cusseta-Chattahoochee County unified government Zoning Ordinance, 13.02. Construction > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SUBDIVISION REGULATIONS A. Extent and thickness of pavement. Areas to be paved together with their dimensions shall be as indicated on the plans. Thicknesses shall not be subject to a minimum tolerance of 1 /2 inch. Overlay pours will not be permitted. B. Preparation of subgrade. The subgrade for miscellaneous concrete shall be finished to line and grade as indicated on the plans and compacted to the same degree as the portion of the roadway on which it is placed. For contracts involving both roadway and bridge contractors, the grading for the slope paving shall be completed by the roadway contractor. Final grading, compacting, dressing, placing and maintaining until structures are completed shall be the responsibility of the bridge contractor. Responsibility for each portion of the work shall be as noted on the plans. Where paving is to be placed on front slopes of ditches and shoulders, any special materials required shall be placed during the appropriate roadway construction. Excavation for toe walls, edge walls, weep hole drain pockets, placing of coarse aggregate in weep hole drain pockets, and all grading, finishing and compacting of the subgrade surface shall be accomplished prior to placing concrete. Mechanical tamps may be required to secure satisfactory compaction. Excavation for velocity dissipaters, spillways, and slope drains shall not be carried below the foundation elevation or wider than necessary to provide working space or to remove soft unsuitable material and backfill with selected material. Where spillways are to be fitted to concrete pavement, the specified dowel bars shall be set into pavement when it is laid. Metal parting strips may be used to hold the ends of dowels bent into the grooves. C. Forms. Forms may be of nominal dimension wood or metal and shall be approved by the engineer. All forms shall be straight and oiled prior to each use. Divider plates and templates shall be of metal. Items which lend themselves to the slip form method of placement may be so constructed. The engineer, however, reserves the right to require the use of fixed forms in the event the slip form methods fails to produce a product which conforms to the requirements for quality, shape, grade, or alignment. D. Weep holes. Weep hole drain pockets filled with coarse aggregate together with weep hole drain pipe or formed opening shall be provided in accordance with plan details. E. Concrete. 1. Mixing. The mixing of Class "B" concrete shall be as specified. a. Small capacity job-site batchers and one bag misers may be used. b. Concrete ingredients may be proportioned volumetrically, provided the equipment calibration and operation of the equipment are approved by the engineer. 2. Placing and finishing. Concrete shall not be placed on a muddy or frozen surface. It shall be deposited within forms or against other pavements on a compacted and wetted subgrade to the depth required to produce the specified thickness. It shall be struck off to a plane surface and finished. a. Concrete slope paving. Shall be given a final finish with a stiff broom. With the engineer's approval, concrete may be mechanically conveyed to the forms. b. Concrete sidewalks. Shall be given a Type V finish, except for the final finish, when so indicated on the plans, shall be made by stiff-bristle brooming. The surface shall be tested with a ten foot straightedge laid parallel to the centerline. Any irregularities in excess of 14 inched in ten feet shall be eliminated while the concrete is still plastic. c. Concrete paved ditches. The surface of the bottom and sides of paved ditches shall be uniform in appearance and true to grade and cross-section. On straight-grade tangents there shall be no deviation of more than one inch in ten feet, zero inches when tested with a ten-foot straightedge. The one inch in ten feet, zero inches tolerance will not be permissible if it reduces the thickness of the ditch paving, ponds water, or alters the direction flow. Finish for ditch paving shall be accomplished by floating with wood floats sufficiently to bring mortar to the surface in the amount necessary to cover the coarse aggregate. Reinforcing, if required, shall conform to plan details. d. Concrete curbs, gutters, and medians. Shall be finished in accordance with "c" above. Face forms shall be removed as soon as possible and the exposed surfaces finished with a wood float. Straight edging, done along the edge of the gutter and top of the curb and median shall conform to those requirements for the adjacent pavement, but with no irregularities to exceed 1 /4 inch in ten feet. Machine methods of placing may be used providing the end result is satisfactory. F. Joints. a. Slope paving. Placing may be done in either horizontal or vertical courses, but not a mixture of both. Horizontal courses shall be approximately level and not less than three nor more than six feet in width measured along the slope. Trapezoidal courses at the top and bottom will be permitted to accommodate sloping berm and ditch line conditions. At construction joints between courses, the paving shall be edged with a tool having 1 /4 inch radius. Vertical contraction or construction joints spaced along the horizontal course at right angles to the horizontal construction joints shall be provided at approximately 40 foot intervals, in line and not staggered. No other vertical lines will be required in horizontal courses. When vertical contraction joints are used, they shall be cut with a single tool 1 /3 the depth of paving during the finishing operation and shall be edged the same as construction joints. Vertical courses shall be approximately equal, and course widths shall not be less than three nor more than five feet measured across the plane of the slope. The width would preferable be four feet. No horizontal lines will be required in vertical courses. Slope paving shall be separated from masonry of structures, sidewalks, curbs and rigid type roadway pavement by preformed joint filler having a thickness of 1 /2 inch. b. Concrete paved ditches. 1. Contraction joints shall be spaced at 30 foot intervals. 2. Expansion joints shall be placed only where the paved ditch joins the roadway pavement or some other structure. 3. Joint sealers will not be required for either expansion or contraction joints. c. Concrete sidewalk. Transverse contraction joints shall be formed with a tool designed to form a groove 1 /3 the depth of the sidewalk at intervals as indicated on standard plans. Where sidewalks abut curb and gutter, alternate joints shall coincide. All edges shall be rounded with a 1 /4 inch edger. Expansion joints shall be of the materials, dimensions, and at locations specified on the plans. d. Concrete curbs, gutters and medians. 1. Contraction joints. Adjacent to concrete paving, the spacing of joints in curb and gutters and medians shall be arranged to coincide with the joint spacing in paving. Joints may be formed by metal divider plates or sawed. The depth of the joint shall be not less than 1 /5 nor more than 1 /4 in depth of the concrete. With the exception of sawed joints, all joints shall be finished with a 1 /4 inch edging tool. For curbs, gutters and medians adjacent to pavement other than concrete, contraction joints shall be as follows: (a) For header curb and combination curb and gutter: Install a contraction joint at a maximum spacing of 20 feet. (b) For gutter and median: Install a contraction joint at a maximum spacing of 20 feet. 2. Expansion joints. Expansion joints shall be formed in accordance with plan details or as directed. They shall coincide with the expansion joints in the adjoining pavement or gutter. All joint filters shall be cut to the same crossAPPENDIX B—SUBDIVISION REGULATIONS Sec. 5, § 1 section as the construction. Any material protruding after the concrete is finished shall be trimmed flush. When these items are not adjacent to concrete construction, expansion joints shall be provided at a minimum interval of 500 feet. 3. Curing. Any method of curing specified. Membrane curing compound, if used, shall be Type 2. Honeycombed areas shall be packed as soon as forms are removed. G. Backfilling. The areas shall be satisfactorily backfilled as soon as possible so the work will not be damaged. H. Clean-up. When all concrete work has been completed, the surfaces shall be cleaned and brought to a uniform appearance. The work shall be protected from staining or other damage until final acceptance. Sec. 14 - Concrete Structures. 14.01 Description. This work shall consist of the manufacture and utilization of Portland cement concrete in the construction of structures. 14.02 Materials. All material shall meet the requirements of the following specifications: Coarse aggregate . . . Section 18.01 Fine Aggregate size No. 10 . . . Section 19.02 Damp proofing or waterproofing material (bituminous) **Portland cement . . . Section 23.01 **Portland-Pozzolan cement . . . Section 23.03 Admixtures: Air entraining admixtures . . . Section 24.01 Retarding admixtures . . . Section 24.02 Water reducing admixtures . . . Section 24.02 Fly ash . . . Section 24.03 *Coarse aggregate may be either Class A or B of the designated size except when limestone or dolomite is used in bridge structures. When limestone or dolomite is used in bridge length structures, Class A coarse aggregate is required. **Type I or Type II Portland cement or Type IP Portland Pozzolan cement shall be used unless otherwise specified. Air entraining cement shall not be used. Bridge sections containing duct enclosures for stressing tendons shall be constructed with concrete No. 7 stone as maximum size.