A. General. The contractor shall be responsible for concrete mix designs, batching, mixing, delivering, and placing concrete in accordance with the specifications. Concrete mixes shall meet requirements of the concrete mix table. Properties of concrete will be determined by the applicable method in the Sampling, Testing and Inspection Manual. B. Concrete mix designs. Concrete mix designs shall be submitted to the engineer for approval. Mix proportions that contain materials from approved sources and produce concrete that meets these specifications will be approved. Concrete mix design proportions may be approved by a method listed in Table C-1. Sec. 15 - Storm Drain Pipe, Pipe-arch Culverts and Side Drain pipe. 15.01 Description. This work shall consist of furnishing and installing storm drain pipe; pipe-arch culverts; tapered pipe inlets; flared end section: bituminous coated, smooth lined, asbestos bonded, corrugated metal pipe; and side drain pipe. The type of pipe to be used, together with acceptable alternates when applicable, shall be as designated on the plans.