A. General requirements. Structures shall be installed in accordance with specifications and in reasonably close conformance with the details shown on the plans or as directed. Structure excavation and foundation preparation shall be as set forth in Section 5. Before pipe and pipe-arches are installed the foundation material shall be shaped as shown on plans. The contractor shall provide necessary temporary drainage. Before any traffic over a culvert is allowed, the contractor shall provide an adequate depth and width of compacted backfill to protect the structure from damage or displacement. Any damage or traffic or erosion shall be repaired or corrected at the contractor's expense. Any debris or silt that constricts the flow through a pope shall be removed by the contractor as often as necessary to maintain drainage throughout the life of the contract. All pipes and pipe-arch culverts shall be cleaned before the work is accepted. B. Installation. 1. Concrete pipe. Flat bottom and circular sections shall be laid in a prepared trench with the socket ends pointing upstream. Sections may be joined by mortar joints, bituminous plastic cement joints, rubber-type gasket joints, O-ringed gasket joints, or preformed plastic gasket joints. In mortar and bituminous plastic joints the annular space shall be filled with the joint material, and inside of each joint wiped smooth. Mortar joints shall be made in the same manner except that the annular space shall be thoroughly wetted before filling with joint material, after the initial set, the mortar on the outside shall be protected from the air and sun with thoroughly wet earth or burlap cover. Rubber-type, O-ring, and performed plastic gasket joints shall be installed in accordance with the manufacturer's recommendations. 2. Cast iron pipe. Pipe sections shall be laid in a prepared trench with bells pointing upstream. The annular space in each joint mortar or bituminous plastic cement as specified of concrete pipe, and each joint wiped smooth. Rubber gasket joints shall be installed in accordance with the manufacturer's recommendations. 3. Corrugated aluminum or steel pipe and pipe arches. Pipe sections shall be laid in a prepared trench with outside laps of circumferential joints pointing upstream and with longitudinal joints at the sides. Helical coupling bands, fastened by two or more bolts, shall join the sections. The space between adjoining sections shall be not more than the width of one corrugation. All damaged spots in galvanized coating that expose the base metal shall be repaired before the structure is backfilled. All damaged spots in bituminous coating that expose the base metal shall be recoated with asphalt before the structure is backfilled. Joints for smooth lines asbestos bonded, corrugated steel pipe shall be formed with an "O-ring" type mechanical seal assembly when so detailed on the plans. Seal assembly should be burnished by the same manufacturer that supplies the pipe. 4. Specials (wyes, tees, and bends). The location and manner of installation of all wyes, tees and bends shall be shown on the plans as directed. 5. Tapered pipe inlets. Tapered pipe inlet end sections will be installed where shown on the plans or as directed. 6. Elongation. Elongation of metal pipe shall be as shown on the plans. The contractor shall order the elongation of the vertical axis of the pipe to be done in the shop. Metal pipe shall be shipped with wire-tie in the pipe ends. Wire ties shall be removes as soon as possible after the fill is completed. 7. [Flared end sections.] Flared end sections may be specified for use either on the inlet or outlet or both ends of storm drain pipe according to plan details. Sec. 16 - Rip Rap. 16.01 Description. This work shall consist of placing protective coverings of sand-cement bag rip rap, stone rip rap, and where called on fill slopes, cut slopes, end rolls, shoulders, ditches stream banks, channel banks, and at other locations required by the plans or the engineer. 16.02 Materials. All materials shall meet the requirements of the following specifications: Portland cement . . . Section 23.01. Rip rap (stone). Bags for sand-cement bag rip rap: The bags shall be of cotton, burlap, or fiber reinforced paper capable of containing the sand-cement mixture without leakage during handling and placing. Bags previously used for sugar or any other material which will adversely affect the sand-cement mixture shall not be used. Capacity shall be not less than 0.75 cubic foot minimum nor more than two cubic feet maximum. 16.03 Construction. This work shall be constructed in accordance with the following requirements: A. Preparation of foundations. The ground surface upon which the rip rap is to be placed shall be brought in reasonably close conformity to the correct lines and grades before placement commences. Where filling of depressions is required, the new material shall be compacted with hand or mechanical tampers. Excess material shall be disposed of by spreading it neatly with the right-of-way, as an incidental part of the work. Unless otherwise shown or provided below, rip rap shall begin in a toe ditch constructed in original ground around the toe of the fill or the cut slope. The toe ditch shall be two feet deep in original ground and the side next to the fill or cut shall have the same slope. After the rip rap is placed, the toe ditch shall be backfilled and the excess dirt spread neatly within the right-of-way, as an incidental part of the work. Where rip rap is to commence in water or below normal water level the tow ditch will be omitted and an apron of rip rap shall be substituted. The width and thickness of this apron shall be as shown or as determined by the engineer. B. Placement of stone rip rap. Rip rap shall be placed to the limits shown on the plans or as directed by the engineer. Rip rap shall be classified and placed as follows: 1. Stone plain rip rap. Stone plain rip rap shall be dumped and handled into place to form a compact layer to the design thickness. The thickness tolerance for the course shall be plus 12 inches with no under-tolerance. If the plans do not show a thickness, stone rip rap shall be placed to a thickness of not less than 12 inches and not more than 24 inches. 2. Stone dumped rip rap. Stone dumped rip rap shall be dumped into place to form a uniform surface and to the thickness specified in the plans. The thickness tolerance for the course shall be minus six inches and plus 12 inches. If the plans or proposal do not specify a thickness, the course shall be placed to thickness of not less than 24 inches. C. Sand-cement bag rip rap. 1. Proportioning materials. Sand and Portland cement shall be mixed at the maximum ratio of 5:1 by weight, and shall obtain a minimum compressive strength of 500 psi in seven days. For sand-cement bag rip rap, the amount of water used shall be just enough to make up the optimum moisture content of the aggregate and cement, as determined by AASHTO: T-134. 2. Placement. The bags shall be uniformly filled to the maximum capacity which will permit satisfactory tying. The bagged rip rap shall be placed by hand with the tied ends facing the same direction, with close, broken joints. When directed by the engineer or required by the plans, header courses shall be placed. After placing, the bags shall be rammed or packed against one another to produce the required thickness and from a consolidated mass. The top of each bag shall not vary more than three inches above or below the required plane. Sec. 17 - Jacking or Boring Pit. Corrugated metal pipe . . . Section 15. Concrete pipe . . . Section 15. Steel pipe . . . AWWA. Cast iron pipe . . . AWWA. Ductile iron pipe (plain ends) . . . AWWA. 17.03 Construction. A. Jacking. 1. When required, suitable pits or trenches shall be excavated for the jacking operation and for placing the end joints of pipe. Where necessary, they shall be securely sheeted and braced to prevent caving. 2. Where pipe is required to be installed under railroads, highways, streets or other facilities by jacking or boring methods, construction shall be done in a manner that will not interfere with the operation of the facility, and shall not weaken the roadbed or structure. 3. Jacks for forcing the pipe through the roadbed shall have a jacking head constructed in such a manner as to apply uniform pressure around the ring of the pipe. The pipe to be jacked shall be set on guides, braced together, to properly support the section of the pipe and direct it to the proper line and grade. In general, roadbed material shall be excavated just ahead of the pipe, the excavated material removed through the pipe, and the pipe then forced through the roadbed into the excavated space. 4. The contractor shall furnish for the engineer's approval, a plan showing his proposed method of handling, including the design for the jacking head, jacking support or back stop, arrangement and position of jacks, pipe guides, etc., complete as assembled. If the contractor elects to weld steel pipe or ductile pipe as a casing and carrier, he shall furnish to the stated materials and research engineer in writing an acceptable welding procedure. This will consist of joint details, preheat temperature and electrodes to be used. The use of welded steel pipe as a sanitary sewer carrier will not be permitted. 5. The diameter of the excavation shall conform to the outside diameter and circumference of the pipe as closely as practicable. Any voids which develop during the installation operation and which are determined by the engineer to be detrimental to the work shall be pressure grouted with an approved mix. 6. The distance that the excavation extends beyond the end of the pipe will depend upon the character of the excavated material, but shall not exceed two feet in any case. This distance shall be decreased on instructions from the engineer if the character of the material being excavated makes it desirable. 7. The pipe shall be jacked from the low or downstream end. Variation in the final position of the pipe from the line and grade established by the engineer will be permitted only to the extent of two percent in lateral alignment, and one percent in vertical grade, providing that the final grade of flow line shall be in the direction indicated on the plans. 8. If the contractor desires, he may use a cutting edge around the head end and extending a short distance beyond the pipe end, with inside angles or lugs to keep the cutting edge from slipping back into the pipe. 9. When jacking of pipe is begun, the operation shall be carried on without interruption, insofar as practicable, to prevent the pipe from becoming firmly set in the embankment. 10. Any pipe damaged in jacking operations shall be removed and replaced by the Contractor at his expense. 11. The pits or trenches excavated to facilitate jacking operations shall be backfilled immediately after the jacking has been completed. B. Boring. The boring shall proceed from a pit provided for the boring equipment and workmen. Excavation for pits and installation of shoring shall be outlined as above. The location of the pit shall meet the approval of the engineer. The holes are to be bored mechanically. The boring may be done using a pilot approximately two inches in diameter which shall be bored the entire length of the installation and shall be checked for line and grade on the opposite end of the bore from the work pit. This pilot hole shall serve as the centerline of the larger diameter hole to be bored. Excavated material will be placed near the top of the working pit and disposed of as required. The use of water or other fluids in connection with the boring operation will be permitted only to the extent necessary to lubricate cuttings. Jetting will not be permitted. 1. Allowable variation from line and grade shall be as specified under jacking. The diameter of the excavation shall conform to the outside diameter of the pipe as closely as practicable. Any voids which develop during installation operation and are determined by the engineer to be detrimental to the work, shall be pressure grouted with an approved mix. Sec. 18 - Coarse Aggregate. 18.01 Coarse aggregate. A. Detrimental substance. The amount of detrimental substances in coarse aggregate shall not exceed the limits listed under the following items: 1. Portland cement concrete. a. Mica schist—5%. Mica Schist is qualitively considered to be those materials defined in ASTM: C 294 as phyllite or schist. To assist in the quantitative analysis of these materials, AASHTO: 7189. Soft fragments may be used. b. Materials passing the No. 200 sieve—1.5%. c. Flat or elongated pieces (length greater than five times average thickness)—10%. d. Sulphur content computed as sulfide sulphur for bridge type structures—0.01%. When the sulphur content exceeds the above maximum in the aggregate, the aggregate shall not be used unless it passes weathering test equivalent to six months or more exposure and a petrographic analysis. e. Deleterious reaction. Aggregate capable of producing a deleterious reaction when combined with Portland cement shall not be used in Portland cement concrete. f. Other local detrimental substances—2.0%. 2. Asphaltic concrete. a. Flat or Elongated Particles (length greater than five times average thickness)— 10%. b. Glassy particles (slag)—30%. c. Other Local Detrimental Substances—2%. d. Fractured faces (gravel)—Crushed gravel shall consist of siliceous particles of which a minimum of 85%, by count, of the material retained on the #4 sieve shall have one or more fractured faces, fractured for the approximate average diameter or thickness of the particle. 3. Surface treatment. a. Material finer than #200 sieve—1%. b. Flat or elongated particles (length greater than five times average thickness)— 10%. c. Glassy particles (slag)—30%. d. Fractured faces (gravel)—Crushed gravel shall consist of siliceous particles of which a minimum of 85%, by count, of the material retained on the #4 sieve shall have one or more fractured faces, fractured for the approximate average diameter or thickness of the particle. B. Classes. Coarse aggregate is classified in accordance with the following physical properties which will govern its use: Percent Wear AASHTO T-96 Class A Class B Group I Aggregate 0—40 41—60 Group II 0—50 51—65 C. Types. 1. Crushed stone. Crushed stone shall consist of sound, durable particles of rock of the class and gradation specified. 2. Gravel. Gravel shall consist of sound, durable rock, free from injurious amounts of coatings of any kind, and shall be of the class and gradation specified. 3. Crushed slag. Crushed slag shall consist of sound, durable particles of air-cooled blast-furnace slag, reasonably uniform in density and quality and shall be of the class and gradation specified. In addition to air-cooled blast furnace slag, other slags having demonstrated a satisfactory service record may be used. Dry slag shall weigh not less than 70 pounds per cubic foot compacted and shall not contain more than 30 percent by weight of glassy particles. Slag will not be permitted as an aggregate for Portland cement concrete. 4. Synthetic aggregate. Synthetic aggregate consist of expanded clay or shale or other manufactured product which is sound, durable, and of the class and gradation specified. D. Groups. 1. Group I. This aggregate shall be limestone, marble or dolomite, or combination thereof. When used in Portland cement concrete of any type or class, it shall meet the abrasion requirement for Class A stone. 2. Group II. This aggregate shall be slag, gravel, granite, gneiss, quartzite, synthetic aggregate, or combination thereof. E. Grading. Coarse aggregate shall be well graded between the limits specified and the size or sizes designated shall conform to the limits shown in Table S-1. F. Tests. Methods of tests shall be in accordance with the following: Soft Fragments AASHTO T- 189 Coal and Lignite AASHTO T- 113 Material passing No. 2 sieve AASHTO T- 11 Sulphur Content AASHTO T-E 30, Evolution Method Weathering Test ASTM- E 42 Petrographic Analysis ASTM C 295 Soundness (magnesium sulfate) AASHTO T-104 Percent Wear AASHTO T-96 Aggregate Gradation AASHTO T-27 Reactivity AASHTO C-227, C-289, and C-586 Sec. 19 - Omitted. Sec. 20 - Backfill Materials. 20.01 Foundation backfill, Type I. Type I backfill material shall be composed of natural or artificial mixtures of materials consisting of hard, durable particles of sand or stone, together with silt, clay and/or humus material. Maximum dry density shall be not less than 100# /cubic foot. 20.02 Foundation backfill, Type II. Type II backfill material shall be crushed stone, well-graded from coarse to fine, other aggregate, or an approved sand-gravel mixture. No overburden or decomposed and/or disintegrated rock will be allowed. All aggregate shall be manufactured from Class A or B coarse aggregate. A. Gradation. The material shall meet the following gradation requirements: Size Percent by Weight Passing 1½" Sieve 100 Passing 1" Sieve 80—100 Passing No. 8 Sieve 0—5 Sieve Analysis AASHTO: T27 20.03 Imperfect trench backfill, Type III. Type III backfill material shall be a natural soil having a density of not more than 95 pounds per cubic foot when tested in accordance with GHD:7, or shall be an artificial mixture of soil and organic material, such as hay, leaves or straw. The mixture, including percentages of each material, shall be as approved by the laboratory. Sec. 21 - Omitted. Sec. 22 - Hot Mix Asphaltic Concrete Mixtures. 22.01 All hot mix asphaltic concrete mixtures shall be composed, mixed, transported, applied, and compacted in place in accordance with Georgia Department of Transportation specifications for Type "E" mix for use in residential areas. Acceleration and Deceleration lanes adjacent to collector and arterial streets shall be constructed using Type "E" and Type "B" asphalt plant mix. Thickness of each layer of asphalt shall be as designed by the engineer or as directed by the County Engineer. Sec. 23 - Cement. 23.01 Portland cement. Portland cement shall meet the requirements of AASHTO: M85 and, in addition, cement which is to be used in Portland cement concrete shall meet the low alkali and the false set requirements of that specification. Cement which has been damaged, or which is partially set, lumpy, or caked shall not be used. A. Types. Type I or Type II Portland cement shall be used for all Portland cement concrete, except high early strength concrete. If high early strength is used Type I or Type III Portland cement will be permitted. B. Blends. Different brands of cement, different types of cement, or the same grade of cement, but from different mills, shall not be mixed or placed in the same storage bin. 23.02 Portland blast—Furnace slag cement. Portland blast—Furnace slag cement for use in cement stabilization shall be the requirements of AASHTO: M 240, Type IS. 23.03 Portland-Pozzolan cement. Portland-Pozzolan cement shall meet the requirements of AASHTO: M240, Type IP, with the following modifications: A. The fly ash content shall be limited to a maximum of 25 percent by weight. B. The Pozzolan shall be limited to fly ash meeting the requirement of fly ash. Sec. 24 - Admixtures. 24.01 Air entraining admixtures. Materials for air enhancement in Portland cement concrete mixtures shall meet the requirements of AASHTO:M 154. Compression and flexure tests shall be made at 7 and 28 days. 24.02 Chemical admixtures for concrete. Chemical admixtures for concrete shall meet the requirements for Type A, B, C, D, and F ASTM: C494, unless otherwise specified. The length change requirements are waived. The admixtures shall contain no more than 0.8% chloride calculated as calcium chloride and the air content shall not exceed 4.0% when prepared in a standard batch without addition or air entraining agent. 24.03 Fly ash. Fly ash is the finely divided residue that results from the combustion of ground or powered coal and is transported from the boiler by fle [flue] gases. For these specifications, it is divided into two types, Type A and Type B, the type to be designated for specific usage. Type A: This type of fly ash is used as an admixture in Portland cement concrete to promote workability and plasticity. The material shall meet the requirements of ASTM: C 618. Type B: This type of fly ash is used as a partial replacement for Portland cement in Portland cement concrete. The material shall meet the following requirements: A. Chemical. Silica on dioxide (SIO2 ) + Aluminum oxide (Al2O 3 ) + Iron oxide (Fe2O 3 ) Minimum, percent 70.00 Silica on dioxide (SIO2 ) Minimum, percent 40.00 Aluminum oxide (Al2O 3 ) 15.00 Magnesium oxide (MgO) Maximum, percent 3.00 Sulphur trioxide (SO3 ) Maximum, percent 3.00 Loss on ignition, Maximum, percent 6.00 Moisture content, Maximum, percent 3.00 Available alkalies as Na2O, Maximum, percent 1.50 B. Physical. Percent retained on No. 325 sieve, 45u Maximum, percent 20.00 Pozzolanic activity index strength of lime pozzolan at 7 days, Minimum, psi 800.00 Change of drying shrinkage of mortar bars at 28 days, Maximum, percent +0.03 Soundness Auto clave expansion of mortar bars, Maximum, percent 0.50 C. Tests. Laboratory tests for acceptance and project control will be selected by the engineer. Methods of tests shall be in accordance with the following: Sampling and testing fly ash ASTM: C311 Sec. 25 - Concrete Pipe. 25.01 Reinforced concrete pipe. Reinforced pipe shall meet the requirements of AASHTO: M170 with the following modifications and additions: A. Coarse aggregate shall conform to the requirements of coarse aggregate, except that the requirements for gradation shall not apply. B. Fine aggregate shall be clean white concrete sand. C. Fly ash used as an admixture shall meet the requirements of fly ash, Type A. D. Before manufacture, the manufacturer may request approval of modified designs which differ from those given in the specifications. E. The manufacturer of concrete pipe shall file with the engineer a certificate stating that all concrete pipe manufactured in his plant for the use on the project contains at least the minimum requirements of reinforcement steel specified herein. The certificate shall be sworn to for the manufacturer by a person having legal authority to bind the company. The manufacturer shall submit with the certificate a guarantee providing that all concrete pipe will be placed, without cost to the purchaser, if the reinforcement steel does not meet these specifications; and the guarantee shall be worded so as to remain in effect as long as the manufacturer continues to furnish concrete pipe for the use on the project. 25.02 Non-reinforced concrete pipe. Non-reinforced concrete pipe intended to be used for the conveyance of sewage, industrial waste and storm water shall conform to the requirements of AASHTO: M86 with the following modifications and additions: A. Same as above. B. Same as above. C. Same as above. Non-Reinforced Pipe Internal Diameter in. Minimum Thickness of Wall, in.(1) Minimum Strength lb/linear ft. Three-Edge Bearing 12 1 1800 15 1¼ 2000 18 1½ 2200 21 1¾ 2400 24 2 2600 NOTE (1): Where tongue-and-groove pipe is furnished, it shall have a minimum wall thickness of 1¾ inch except that the above minimum thickness applies if the groove end is modified to give a groove thickness equal to three-fourths of the thickness of the wall of pipe. This measurement shall be taken one-quarter inch from the outer end of the groove. D. The ends of non-reinforced pipe shall be so formed that when the pipe are laid together and joined they make a conduit with a smooth and regular interior surface. 25.03 Concrete underdrain pipe. Unless otherwise restricted on the plans, concrete underdrain pipe may be extra strength porous concrete conforming to the requirements of AASHTO:M 176, or standard perforated non-reinforced concrete underdrain pipe conforming to the requirements of AASHTO: M 86, Table 1, both with the requirements of AASHTO: M86, Table 1, Class 1. Sec. 26 - Steel Pipe. 26.01 Corrugated steel culvert pipe and pipe arches. Corrugated steel culvert pipe and pipe arches shall conform to the requirements of Type I or Type II culvert pipe AASHTO: M36 for the specified dimensions and thicknesses with the following exception: Special sections, such as elbows and flared end sections for these conduits shall be of the same plate thickness as the conduit to which they are joined, and shall conform to the applicable requirements of AASHTO: m36. 26.02 Bituminous coated corrugated steel culvert pipe. Bituminous coated corrugated steel pipe shall conform to the requirements of AASHTO: M190 for the specified sectional dimensions, plate thickness and type of bituminous coating. Coupling bands shall be fully coated with bituminous material. Special sections, such as elbows and flared end sections, for these conduits shall be of the same plate thickness as the conduit to which they are joined and shall conform to the applicable requirements of AASHTO: m190. Coating and invert paving shall be of the type specified. 26.03 Steel structural plate for pipe, pipe arches, and arches. Corrugated steel plate pipe, pipe arches and arches shall consist of structural plates and galvanized corrugated steel of the size, shape, and thickness shown on the plans. They shall conform to the requirements of AASHTO: M167 and AASHTO: M36, and the following additional requirements when applicable. A. Bituminous coating. If bituminous coating is specified, the coating shall meet all requirements above for the type specified. After the structure has been erected, but before any backfill has been placed, the contractor shall replace any coating which may have been removed or damaged during erection on inside or outside, with bituminous material. B. Forming and punching plates. After corrugating, each plate shall be curved to the proper radius, and the bolt holes shall be punched in accordance with dimensions shown on the plans. Bolt holes shall be in staggered rows two inches apart, and one hole shall be punched in the valley, and one in the crest of the corrugations for each longitudinal edge of each plate. The centers of the holes shall be not closer to the edge of the plate than two times the diameter of the holes. Bolt holes for circumferential seams shall be spaced not more than 12 inches center to center. The plates shall be of such thickness and curvature that when bolted together, the circles or arches formed will be in accordance with the plans and specifications for the structure. C. Bolts. Galvanized bolts, nuts and washers used in the fabrication of the structure shall be furnished by the manufacturer. They shall be at least 11 16 inch in diameter one to 1¾ inches long, depending on the thickness and number of plates. The length of the bolts shall be measured from under side of the bolt head. The underside of the bolt head shall be so shaped that full bearing of the bolt head is obtained. The face of the nut shall be rounded to the same curvature as the corrugations unless a shaped washer providing full bearing for the nut is used. Sec. 27 - Omitted. Sec. 28 - Pipe Appurtenances. 28.01 Flanges for cast iron pipe and fittings. These flanges shall conform to ANSI: B 16.1 Class 125. 28.02 Sewer joint sealing compound. This hot pour sealing compound shall conform to the Federal Specifications SS-S 169. 28.03 Resilient clay pipe joints. These jointing connections shall conform to the requirements of ASTM: C 425.