--- title: Cusseta-Chattahoochee County unified government Zoning Ordinance, 2.02. Construction collection: local-codes id: local-code:cusseta-chattahoochee/zoning/2.02 cite_as: Cusseta-Chattahoochee County unified government, Ga., Zoning Ordinance § 2.02 canonical_url: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/2.02 md_url: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/2.02.md text_url: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/2.02/text source_url: https://library.municode.com/ga/cusseta-chattahoochee_county date: 2026-11-11 status: active jurisdiction: consolidated:cusseta-chattahoochee jurisdiction_name: Cusseta-Chattahoochee County unified government place_fips: "1321017" county_fips: "13053" corpus_version: local-codes-cusseta-chattahoochee-687486f048f6 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/~appendix-b.md previous: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/1.02.md next: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/6.02.md index: https://georgiacommons.org/code/local/cusseta-chattahoochee.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:cusseta-chattahoochee/zoning/2.02@2026-11-11-6335a81239 --- # Cusseta-Chattahoochee County unified government Zoning Ordinance, 2.02. Construction > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SUBDIVISION REGULATIONS A. General. The contractor will establish right-of-way lines and construction lines, and designate all trees, shrubs, plants, and other things to remain. The contractor shall preserve all things designated to remain. B. Clearing. Clearing consists of the removal from the right-of-way lines and proper disposal of all exposed objectionable matter, such as trees, brush, stumps, logs, grass weeds, roots, decayed vegetable matter, poles, stubs, rubbish, refuse dumps, sawdust piles, loose (boulders of one cubic yard or less existing outside of construction limits), and other debris resting on, or protruding through the ground surface, or appearing on the right-of-way at any time before final acceptance of the work. C. Grubbing. 1. Definition. Grubbing consists of the removal from the right-of-way and proper disposal of objectionable matter defined above, under clearing, which is embedded in the underlying soil. 2. When items are removed as clearing and grubbing, they shall be removed to the following depths: (a) Under pavements. Remove to a depth of at least three feet below finished subgrade. (b) Beneath other structures. Remove to a depth of at least three feet below the foundations of any proposed structure including installations such as guardrail posts, utility poles, and the like. (c) Elsewhere in the right-of-way. Remove to at least three feet below the finished surface of slopes and shoulders, and one foot below natural ground outside construction lines. Abandoned structures remaining in place which may impound water, (such as concrete floors, basements, catch basins, and the like) shall be thoroughly cracked or otherwise broken where they are present within ten feet of finished grade. Floor and the like shall be broken to the extent that no section exceeding ten square feet remains intact. 3. Areas adjacent to selected trees and shrubs shall be grubbed whenever grubbing can be done without damage to the living roots of the selected trees or shrubs. 4. Combustible material. All combustible material except sawdust piles may be burned on the right-of-way except where prohibited by local air pollution control regulation. Burning on the right-of-way shall be done so as to prevent fire from spreading to adjacent areas and to prevent damage to living trees and shrubs which are to remain in place, either on or off the right-of-way. Care shall also be taken to prevent damage to all public and private installations either within or adjacent to the right-of-way and to the traveling public. All burning of right-of-way material shall be permitted by the proper agencies of the Georgia Department of Natural Resources and/or the Georgia Forestry Commission. Sec. 3 - Roadway Excavation. 3.01 General. Roadway excavation shall consist of the exaction, hauling and satisfactory placement of disposal of all material. This work shall also include all ditch excavation with the exception of channel excavation. All suitable materials excavated from ditches shall be utilized in the construction of roadway embankments except where otherwise directed by the engineer. Material excavated from the ditches, which is unsuitable for roadway construction, shall not be deposited or allowed to remain within three feet of the edge of the ditch. Such material shall not be left in unsightly piles, but shall be spread in uniform layers, neatly leveled and shaped. Adequate openings shall be provided in spoil banks to allow surface drainage of adjacent land. When shown on the plans or required by the engineer, surface ditches of adequate dimensions shall be cut at the tops of cut slopes, extending to each end of the cuts in order to carry the water from the side hill. Side ditches or gutters emptying from cuts to embankments shall be turned outward so as to avoid erosion of the embankments. When excavation operation encounters artifacts of historical or archaeological significance, such operations shall be temporarily discontinued and not resumed until directed by the engineer. All material to be excavated, regardless of its nature or composition, shall be defined as unclassified excavation, unless otherwise specified on the plans. All suitable material removed in the excavation shall be used, as far as practicable, in formation embankments, subgrades, shoulders, and at such other places as may be on the plans or directed by the engineer. The engineer will designate materials which are unsuitable. 3.02 Erosion and siltation control. The contractor shall take whatever measures necessary throughout the life of the project to control erosion and to minimize silting of rivers, streams, and impoundments. Construction of drainage facilities as well as performance of all other contract work, which will contribute to the control of erosion and siltation, shall be carried out in conjunction with earthwork operations. 3.03 Rock excavation. Rock, wherever encountered, shall be removed and disposed of as shown on plans or as directed by the engineer. In a cut, when rock is encountered, any flattening of the slope already begun shall be transitioned to leave the cut with a pleasing appearance. 3.04 Unsuitable material excavation. When the engineer determines that the existing material is undesirable in its location or condition, the engineer may require the contractor to remove the undesirable material and backfill with approved material, properly compacted. In cut areas where the material in place is not suitable for subgrades or shoulders, it shall be undercut to the depth established by the engineer and the undercut area backfilled with suitable material. In roadway cuts, any stripping excavation of unsuitable material shall be done and the material disposed of, as directed by the engineer. Sec. 4 - Borrow Excavation. 4.01 Description. The work covered by this section consists of the excavation of material from borrow areas or pits. Outside the project right-of-way; hauling and utilization of such material as required on the plans or directed by the engineer. 4.02 Materials. Borrow excavation shall be material approved by the engineer as meeting the requirements for the particular use intended. Embankment materials shall meet the requirements as specified in Section 20, Backfill Materials. 4.03 Construction. Borrow pits furnished by the contractor shall be approved by the engineer. Sec. 5 - Excavation and Backfill For Minor Structures. 5.01 Description. This work shall consist of the excavation and backfill, or disposal of all materials required for the installation of bridge culvert, pipe, arch culvert, headwall and retaining wall structures in accordance with the specifications and the details shown on the plans or established by the engineer. 5.02 Materials. All materials shall meet the following requirements of the following specifications: Foundation Backfill Material—Type I Section 20.02 Foundation Backfill Material—Type II Section 20.02 Imperfect Trench Backfill Material—Type III Section 20.03 5.03 Locations and elevations. The locations and elevations of structures shown on the plans are approximate. Final locations and elevations will be determined by the engineer. 5.04 Excavation. The engineer will determine the minimum requirements for length and depth of excavation for each structure. Necessary sheeting and bracing shall be installed by the contractor without additional compensation. Except for concrete or masonry structures, wherein the entire structure rests on solid rock, al excavation through rock or boulder formations shall be extended to at least one foot below the bottom of the structure and then backfilled with Type I or Type II material to the proper subgrade elevation. When pipe lines are on the steep gradients, excavation and the placement of pipe on a new embankment may be done in increments as the embankment construction progresses. Where existing paved areas are to be retained, all cutting of surfaces at structure trenches shall be done in such a manner as to prevent damage to the adjacent pavement. Material excavated from the pipe trenches shall be considered unclassified excavation. 5.05 Backfill. Backfill materials meeting these specifications shall be obtained from sources approved by the engineer. A. Foundation backfill materials, Type I and Type II. These materials will be used as shown on the plans or as directed by the engineer. In general, Type I material will be used in reasonably dry structure trenches, and Type II material will be used as a finishing course for Type II material. All areas of excavation beyond specified limits shall be backfilled with the same type of material required for the adjacent area. Type I and Type II backfill material shall be placed in layers of not more than six inches loose. Each layer shall be compacted as follows: Type I backfill material: Compact to 95 percent of the theoretical dry density determined by GHD: 7. Type II backfill material: Compact to a satisfactory uniform density as directed by the engineer. B. Imperfect trench backfill material, Type III. This material will be placed as loose uncompacted backfill over pipe structures, as shown on the plans where imperfect trench backfill is specified. C. Rock larger than four inches in any diameter shall be placed within two feet of any drainage structure. D. Backfill behind retaining walls, unless otherwise specified, shall be pervious material and meet the requirements of Case I or Case II as follows: Case I: Case I refers to backfills for retaining walls required for the support of roadbeds and parking areas, in which case, the backfill shall conform to requirements of Section 20, except that no rock more than four inches in any diameter shall be placed within two feet of the retaining wall or finished surface. Case II: Backfills for retaining walls required for the support of roadbeds or parking areas shall conform to requirements of Case I above, except that the backfill shall be compacted to the density of the adjacent soil. 5.06 Pavement replaced. Where adjacent pavements are to be retained, pavement removed at structure trenches shall be replaced in-kind, or when approved, with equal or better material. After backfilling, the contractor shall maintain a smooth riding surface until the repaving is completed. Sec. 6 - Subgrade Construction. 6.01 Description. This work shall consist of placing, mixing, compacting, and shaping the top six inches, or to the plan indicated thickness, of the roadbed in both excavation and embankment areas. This work also includes subgrade stabilization, select material subgrades and shoulder stabilization.