engineer determines that the existing material is undesirable in its location or condition, the engineer may require the contractor to remove the undesirable material and backfill with approved material, properly compacted. In cut areas where the material in place is not suitable for subgrades or shoulders, it shall be undercut to the depth established by the engineer and the undercut area backfilled with suitable material. In roadway cuts any stripping excavation of unsuitable material shall be done and the material disposed of as directed by the engineer. Sec. 4. Borrow excavation.