The work covered by this section consists of the excavation of material from borrow areas or pits, outside the project right of way; and hauling and utilization of such material as required on the plans or directed by the engineer. 4.02 Materials. Borrow excavation shall be material approved by the engineer as meeting the requirements for the particular use intended. Embankment materials shall meet the requirements as specified in section 20, Backfill Materials.