--- title: Cusseta-Chattahoochee County unified government Zoning Ordinance, 7.03. Construction collection: local-codes id: local-code:cusseta-chattahoochee/zoning/7.03 cite_as: Cusseta-Chattahoochee County unified government, Ga., Zoning Ordinance § 7.03 canonical_url: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/7.03 md_url: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/7.03.md text_url: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/7.03/text source_url: https://library.municode.com/ga/cusseta-chattahoochee_county date: 2026-11-11 status: active jurisdiction: consolidated:cusseta-chattahoochee jurisdiction_name: Cusseta-Chattahoochee County unified government place_fips: "1321017" county_fips: "13053" corpus_version: local-codes-cusseta-chattahoochee-687486f048f6 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/~appendix-b.md previous: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/6.03.md next: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/11.04.md index: https://georgiacommons.org/code/local/cusseta-chattahoochee.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:cusseta-chattahoochee/zoning/7.03@2026-11-11-fe73cc21dc --- # Cusseta-Chattahoochee County unified government Zoning Ordinance, 7.03. Construction > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SUBDIVISION REGULATIONS A. Placing materials. The materials shall be spread uniformly with a mixture spreader to the proper depth to obtain the specified thickness. Graded aggregate materials containing frost or frozen particles shall not be placed. B. Thickness of course. The maximum thickness to be laid in one course shall be six inches compacted. If the design thickness of the base, sub base or shoulder course is more than six inches, it shall be constructed in two or more courses of approximately equal thickness. With sufficient and suitable equipment, the engineer may allow base material to be placed in lifts up to eight inches. C. Compaction. The moisture content of the mixture of materials at the time of compaction shall be uniformly distributed and shall be adequate to allow compaction to the specified density. After the material placed has been shaped to line, grade and cross-section, it shall be rolled until the course has been uniformly compacted to at least 98 percent of the maximum dry density. The compacted base shall have sufficient stability to support construction equipment without pumping regardless of compaction. If the base material becomes unstable as a result of too much moisture, the base material and the underlying subgrade, if necessary, shall be dried and reworked to a moisture content that will provide stability and compaction. D. Tests. AASHTO: T180 Method D. Sec. 8—10 - Omitted. Sec. 11 - Bituminous Prime. 11.01 Description. The work shall consist of preparing and treating an existing surface with bituminous material and blotter material, if required, in accordance with these specifications and in reasonably close conformity with the lines shown on the plans or established by the engineer. Bases and other areas to be primed shall be as follows: 1. All cement or lime stabilized bases or sub bases, regardless of pavement thickness. 2. All bases, sub bases or other area, with the exception of asphaltic concrete or sand asphalt bases or sub bases, on which bituminous surface treatment is to be placed. 3. All bases, sub bases or other areas on which less than five inches, total thickness, of hot mix asphaltic concrete is to be placed, with the exception of asphaltic concrete bases. 11.02 Materials. Unless otherwise specified, the types of bituminous materials shall be selected by the contractor. The engineer will determine the grade of materials to be used. The specifications for the bituminous materials are: Latest Revision GA D.O.T, Spec. or as Amended Cut back Asphalt, RC-30, RC-70 RC-250, or MC-250, MC30 or MC70 821.01 Emulsified Asphalt, EAP-a 822.01 Tars, RT-2, RT-3 8270.1 Cut back Asphalt Emulsion, CBAE-2 823.01 Blotter Materials (Sand) 412.04 F.3 11.03 Equipment. The contractor shall provide sufficient equipment in good repair. The following units shall be minimum requirements: Pressure distributor Power Broom and blower Aggregate spreader (if required)