--- title: Cusseta-Chattahoochee County unified government Zoning Ordinance, Sec. 1 (Appendix B, no. 4 so numbered). Street design, standards, easements, drainage, etc collection: local-codes id: local-code:cusseta-chattahoochee/zoning/appendix-b-1-4 cite_as: Cusseta-Chattahoochee County unified government, Ga., Zoning Ordinance, Appendix B, § 1 (no. 4 so numbered) canonical_url: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/appendix-b-1-4 md_url: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/appendix-b-1-4.md text_url: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/appendix-b-1-4/text source_url: https://library.municode.com/ga/cusseta-chattahoochee_county date: 2026-11-11 status: active jurisdiction: consolidated:cusseta-chattahoochee jurisdiction_name: Cusseta-Chattahoochee County unified government place_fips: "1321017" county_fips: "13053" corpus_version: local-codes-cusseta-chattahoochee-687486f048f6 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/~appendix-b.md previous: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/appendix-b-4-3.md next: https://georgiacommons.org/code/local/cusseta-chattahoochee/zoning/1.02.md index: https://georgiacommons.org/code/local/cusseta-chattahoochee.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:cusseta-chattahoochee/zoning/appendix-b-1-4@2026-11-11-4544d4defb --- # Cusseta-Chattahoochee County unified government Zoning Ordinance, Sec. 1 (Appendix B, no. 4 so numbered). Street design, standards, easements, drainage, etc > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SUBDIVISION REGULATIONS (A) General Requirements. (1) Continuation of adjoining street system. The proposed street layout shall be coordinated with the street system of the surrounding area, with the topography, with such natural features as streams and tree growth, with public convenience and safety, and with the proposed use of the land to be served by such streets. (2) Access to adjacent properties. Where, in the opinion of the County, it is desirable to provide for access to an adjoining property, proposed roadways shall be extended by dedication to the boundary of such property and joined with the existing roadways, where such roadway exists or with other proposed roadways. Where no roadway exists, or where the adjoining property is in alignment with a proposed roadway, a temporary turnaround shall be provided at the boundary of said property. (B) Street Design Standards. The design standards which shall be as follows: (1) Right-of-way widths. Minimum right-of-way widths shall be as follows: Arterial 120 feet Collector 80 feet Subdivision 60 feet (2) Pavement widths. Pavement widths plus curb and gutter widths (when applicable) shall be not less than the following: a. Arterial: With curb and gutter 53 feet (back to back of curb) Without curb and gutter 24 feet (w/12 ft. shoulder) b. Collector: With curb and gutter 45 feet (back to back of curb) Without curb and gutter 24 feet (w/10 ft. shoulder) c. Subdivision streets: With curb and gutter 31 feet (back to back of curb) Without curb and gutter 24 feet (w/19 ft. shoulder) d. Base thickness: Six inches minimum residential, all others by design e. Pavement thickness: Two inches minimum residential, all others by design. 200 lbs/s4 of GDOT Type "E" asphalt paving and 100 lbs/s4 of GDOT Type "E" asphalt paving two years after acceptance. (3) Grades. a. Roadway grades shall not be more than 12 percent nor less than 0.5 percent, unless approved by the County. b. Grades approaching intersections may not exceed eight percent for a distance of not less than 100 feet from the centerline of said intersection unless otherwise approved by the County. (4) Horizontal curves. Where a centerline deflection angle of more than five degrees occurs, a circular curve shall be introduced, having a centerline radius of not less than the following: Arterial roadways 500 feet Collector roadways 350 feet Subdivision roads 150 feet (5) Vertical curves. All vertical curves shall have such length as necessary to provide safe stopping sight distance. The stopping sight distance shall be specified as a line of sight measured along the centerline from a point of 3.75 feet above the surface of the pavement to a fixed object six inches in height. The following distances are examples of various speeds. For speeds not shown, calculate the stopping sight distance using formulas recommended by the Institute for Traffic Engineers (ITE): Design Speed Stopping Sight Distance 20 mph 150 feet 30 mph 200 feet 40 mph 275 feet 50 mph 350 feet (6) Tangents. There shall be a tangent of at least 100 feet between reverse curves, unless otherwise approved by the County. (7) Intersections. Roadway intersections shall be laid out as follows: a. Roadways shall intersect as close as possible at right angles, and no streets intersect at less than 60 degrees. b. Intersections with arterial roadways shall be at least 800 feet apart measured from centerline to centerline. c. Street jogs shall not be less than 125 feet measured from centerline to centerline. d. Proper sight lines shall be provided and maintained at all intersections. Measured along the centerline, 3.75 feet above grade, there shall be a clear sight distance triangle of 300 feet on major arterials, 200 feet on collector roadways, and 100 feet on subdivision roadways, measured from a point of the centerlines intersection. (8) Temporary turn-around. A temporary turn-around, 40 feet in radius, shall be where the logical extension of a subdivision roadway is terminated. (C) Easements. Utility and other easements shall be provided as follows: (1) When the County deems it necessary, utility easements shall be provided. All easements shall be a minimum of ten feet in width. All easements accepted by the County for utility construction shall be cleared, grubbed and graded by the subdivision developer. Prior to installation of waterlines, a developer will be required to provide the County with a layout plan and specifications for construction utilizing an accepted waterline easement plan. During construction, it will be necessary for the County to make periodic inspections and to observe the pressure testing when water is placed in the lines. Following all approved inspections, with specifications regarding materials and tests, the County will accept the water mains for maintenance and will operate in accordance with the rights granted in the respective water line easements. The developer will provide to the County's Attorney an acceptable title opinion to easement property. (2) Where a subdivision is traversed by a natural or manmade watercourse, drainage way, channel, or stream, or a storm water easement or drainage right-of-way conforming substantially to the lines of such watercourses, drainage ways, channels, or streams; easements shall be provided as determined by the County. (D) Storm Drainage. (1) Storm drainage shall be designed for 25 year return frequency storms. Detention ponds shall be designed for the 100 year return frequency. (2) Every subdivision shall be served by storm drainage facilities, including drains, sewers, catch basins, culverts and other facilities as required by standards and specifications of the County. (3) Drainage facilities shall be located in the road right-of-way where feasible, or in perpetual unobstructed easement of appropriate width. (4) Use of catch basins at road intersections are specified and shall be arranged in such a manner that will not permit water to cross intersection. Unless otherwise specified by the County, cross drainage of roadways or intersections via valley gutter is prohibited. (E) Water Supply. (1) When, in the written opinion of the Georgia Department of Natural Resources through the local health department and the County water works, public water supply is within a reasonable distance, the subdivider shall install or have installed a system of water mains and connect to such supply. The installation shall be prior to the paving of the street. The public water supply shall be installed by the County Public Works Department, but at the developer's cost. (2) Where a public water supply is not available, each lot in a subdivision shall be furnished with a water supply acceptable to and approved by the Georgia Department of Natural Resources through the local health department. (F) Inspection During Construction. The contractor shall provide all testing designated by the County. All construction performed under the auspices of these regulations shall be subject to inspection by the County. The contractor shall be responsible for notifying the County in writing prior to commencement of any such work. If the contractor fails to make this notification, he shall then be responsible for the expense of any operation or laboratory testing by the County to ascertain compliance with specifications. (G) Acceptance of Improvements. The County shall have the authority to reject any material or work that does not meet the requirements of specification adopted by the County. (H) Guarantee of Work. The developer shall guarantee all work performed by him or his agent against failure for a period of two years after completion of work. To insure compliance with the above, performance bond in an amount determined by the County shall be posted. (I) Specification Note. These specifications refer to "contractor and developer". In these specifications, they are interchangeable and/or one in the same. The engineer or inspector is any agent or individual(s) so designated by the Chairman of the County Commission. (J) Additional Requirement. The subdivision developer shall be required to secure necessary permits for connecting new subdivision construction to existing federal, state, and county highways. The developer will construct all approaches, acceleration/deceleration lanes, drainage, and pavement in accordance with approval plans and permits. The developer will be required to provide the County with a letter of approval of the connection to existing highway. Also, the developer is required to meet all specification and requirements of the U.S. Soil and Water Conservation Service and the Georgia Department of Natural Resources. (K) Construction Specifications. (1) [Generally.] After the effective date of these regulations, the County will not accept any dedicated improvements until the improvements have been completed by the subdivider of the subdivision in conformance with construction plans approved by the County in accordance with these regulations. (2) Specific Construction Specifications. Specific construction specifications are described in the following Section 1 through Section 30: Sec. 1 - Temporary silt fence. Sec. 2 - Clearing and grubbing right-of-way. Sec. 3 - Roadway excavation. Sec. 4 - Borrow excavation. Sec. 5 - Excavation and backfill for minor structures. Sec. 6 - Subgrade construction. Sec. 7 - Graded aggregate base. Sec. 8—10 - Omitted. Sec. 11 - Bituminous prime. Sec. 12 - Bituminous tack coat. Sec. 13 - Miscellaneous concrete. Sec. 14 - Concrete structures. Sec. 15 - Storm drain pipe-arch culverts and side drain pipe. Sec. 16 - Rip rap. Sec. 17 - Jacking or boring pit. Sec. 18 - Coarse aggregate. Sec. 19 - Omitted. Sec. 20 - Backfill materials. Sec. 21 - Omitted. Sec. 22 - Hot mix asphaltic concrete mixtures. Sec. 23 - Cement. Sec. 24 - Admixtures. Sec. 25 - Concrete pipe. Sec. 26 - Steel pipe. Sec. 27 - Omitted. Sec. 28 - Pipe appurtenances. Sec. 29 - Precast concrete catch basin, drop inlet, and manhole units. Sec. 30 - Grassing. Sec. 1 - Temporary Silt Fence. 1.01 Description. The work covered by this section consists of furnishing, installing, maintaining, and removing a water permeable filter type of fence suspended particles from the drainage.